#TITLE_ALTERNATIVE#

Abstract: <br /> <br /> <br /> <br /> <br /> The barchart is the most frequently and widely used in construction schedule because of its simplicity, ease of preparation, and easily understandable format. A barchart is collection of activities listed in a vertical c...

Full description

Saved in:
Bibliographic Details
Main Author: Widodo (NIM 250 04 007), Agus
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/5676
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first