WASTE MANAGEMENT DEVELOPMENT SYSTEM IN CIDADAP DISTRICT, BANDUNG CITY (CASE STUDY: KAPTEN ABDUL HAMID STREET)

: Environmental sanitation issues are the closest in everyday life and often cause various problems, one of which is waste. One of the technical aspects that is still a problem is the unavailability of adequate waste management facilities and infrastructure so that waste is not managed properly, inc...

Full description

Saved in:
Bibliographic Details
Main Author: Tri Mulyaningsih, Agnesia
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/57040
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:: Environmental sanitation issues are the closest in everyday life and often cause various problems, one of which is waste. One of the technical aspects that is still a problem is the unavailability of adequate waste management facilities and infrastructure so that waste is not managed properly, including in the study review area, namely Panorama TPS. One of the waste problems at TPS Panorama is the collection pattern. This Panorama TPS is a TPS with lane rotation. In addition, the TPS facilities and infrastructure are not adequate and the operational aspects do not meet the appropriate storage standards in order to minimize waste generation. To answer the problems related to solid waste in Cidadap, waste management efforts are needed to minimize the residue transported to the TPA. The contribution of waste generation at TPS Panorama is 8.9968% of the waste generated entered in the Cidadap District Area. To facilitate transportation or transfer, it is necessary to plan service blocks so that the transfer stage can be carried out effectively and efficiently. After going through the consideration of effectiveness, the processing of organic waste uses the Biodrying method. Biodrying is a technology used to reduce the water content of organic materials using microorganisms that naturally increase the temperature in the decomposition process. With this process, the water content can drop from 60% to 20% in less than a month. Meanwhile, Inorganic Waste Processing of plastic type is used as waste-to-energy with a pyrolysis process using the dry distillation method. So that it can be calculated as a whole system, the price of waste processing is IDR 139,127 per ton of waste.