RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD

Exploration activity is indispensable to minimize the risks inherent in the mining industry where exploration must provide complete information about the deposit such as the resource estimation model. Resource estimation using conventional or linear geostatistical methods sometimes produces less...

Full description

Saved in:
Bibliographic Details
Main Author: Sirait, Joseph
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/57317
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57317
spelling id-itb.:573172021-08-12T13:43:00ZRESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD Sirait, Joseph Indonesia Theses coefficient of correlation, Ordinary Cokriging (COK), Ordinary Kriging (OK), composited data, variance estimation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57317 Exploration activity is indispensable to minimize the risks inherent in the mining industry where exploration must provide complete information about the deposit such as the resource estimation model. Resource estimation using conventional or linear geostatistical methods sometimes produces less accurate results. Therefore the nonlinear geostatistical method such as multivariate geostatistics is expected to provide more accurate estimation. The case study for this research is Pongkor gold veins located in the district of Bogor, West Java, Indonesia about 80 km southwest of Jakarta or at the northeastern side of the Dome Bayah. Gold and silver mineralization was contained in Pongkor gold vein deposit. This study aims to determine the results of the estimated blocks and their variance estimation on Au-Ag grades using Ordinary Cokriging (COK) as one of multivariate geostatistical methods. However the linear geostatistical method such as Ordinary Kriging (OK) as frequently used methods was performed for comparison. Both methods were validated using composited data by considering the slope of regression and coefficient of correlation between estimated grades and composited actual grades. The Au-Ag assays data was divided into two parts, i.e. data without top cut and data using top cut. Variogram of Au-Ag grades and their cross-variogram were used as estimation parameters for COK and OK. The correlation coefficient of estimated grades and composited actual data showed the strong correlation with coefficient more than 0.6. COK produced smaller estimation variances on Au-Ag estimates than OK method. Grade-tonnage curve on block estimation was established to see the difference in the estimation results of both methods.The data with and without top cut showed no significant different in the validation results. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Exploration activity is indispensable to minimize the risks inherent in the mining industry where exploration must provide complete information about the deposit such as the resource estimation model. Resource estimation using conventional or linear geostatistical methods sometimes produces less accurate results. Therefore the nonlinear geostatistical method such as multivariate geostatistics is expected to provide more accurate estimation. The case study for this research is Pongkor gold veins located in the district of Bogor, West Java, Indonesia about 80 km southwest of Jakarta or at the northeastern side of the Dome Bayah. Gold and silver mineralization was contained in Pongkor gold vein deposit. This study aims to determine the results of the estimated blocks and their variance estimation on Au-Ag grades using Ordinary Cokriging (COK) as one of multivariate geostatistical methods. However the linear geostatistical method such as Ordinary Kriging (OK) as frequently used methods was performed for comparison. Both methods were validated using composited data by considering the slope of regression and coefficient of correlation between estimated grades and composited actual grades. The Au-Ag assays data was divided into two parts, i.e. data without top cut and data using top cut. Variogram of Au-Ag grades and their cross-variogram were used as estimation parameters for COK and OK. The correlation coefficient of estimated grades and composited actual data showed the strong correlation with coefficient more than 0.6. COK produced smaller estimation variances on Au-Ag estimates than OK method. Grade-tonnage curve on block estimation was established to see the difference in the estimation results of both methods.The data with and without top cut showed no significant different in the validation results.
format Theses
author Sirait, Joseph
spellingShingle Sirait, Joseph
RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
author_facet Sirait, Joseph
author_sort Sirait, Joseph
title RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
title_short RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
title_full RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
title_fullStr RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
title_full_unstemmed RESOURCES ESTIMATION OF GOLD VEIN DEPOSIT USING MULTIVARIATE GEOSTATISTICAL METHOD
title_sort resources estimation of gold vein deposit using multivariate geostatistical method
url https://digilib.itb.ac.id/gdl/view/57317
_version_ 1822002610434998272