FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD

Fluctuate oil price has become global challenge in oil and gas industry since 2015. This situation impacted daily operation and production process in every oil company in the world. PT. Cipher Pol Indonesia as world class and one of the largest oil company in the world also forced to do adjustment t...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Hasan, Wahyuda
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/57384
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57384
spelling id-itb.:573842021-08-19T13:36:38ZFAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD Nur Hasan, Wahyuda Manajemen umum Indonesia Theses loss production opportunity, DMAIC (Define Measure Analyze Improve Control), rigless, root cause analysis, decision analysis, database integration, web-based dashboard tools INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57384 Fluctuate oil price has become global challenge in oil and gas industry since 2015. This situation impacted daily operation and production process in every oil company in the world. PT. Cipher Pol Indonesia as world class and one of the largest oil company in the world also forced to do adjustment to achieve more efficient and effective operation. Loss Production Opportunity (LPO) is one of production operation component that occurred in daily basis. LPO quantify amount of oil that loss Dorieng operation process. The more LPO occurred, the less company revenue generated from daily operation. LPO could come from rig operation and rigless operation. One of rigless operation that causing LPO is due to polish rod failure that need to be replaced with the new one using rigless unit. Not all change polish rod job is successful. Some of them also failed and need rig program to get production well back to production. However, actual condition in the field showing there are some gaps identified related to the delay rig program generation for failed change polish rod job that ultimately increase LPO. The delay in generating rig program for failed CPR job causing 3,731 barrel oil additional LPO from January 2018 – July 2020. Through this research, project team try to identify root cause from business problem and develop project implementation plan to solve the business problem. Lean Sigma DMAIC methodology are adopted as conceptual framework. Cross functional team as project team implement step by step from lean sigma method and held several sessions of brainstorming meeting. In root cause analysis, project team using FiveWhy and Waste Analysis method as guidance to determine problem root cause and generate alternatives. The information delay from operator/rigless crew about failed change polish rod job was identified as root cause problem. From root cause analysis, project team identified two possible alternatives using Kepner- Tregoe Decision Analysis methodology. The best alternative is chosen based on Must & Want criteria in which Must criteria is Transfer-able to the new block operator while Want criteria is based on: Relevancy with Root Cause, Low Cost, High Impact, and Easy to Execute. Database Integration and Synchronization to trigger Exception Signal into web-based dashboard is chosen as the best alternative to be implemented with total score of 99. Through this project, project team aim to save ~612 $ per day or 223.4 MUSD yearly. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Nur Hasan, Wahyuda
FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
description Fluctuate oil price has become global challenge in oil and gas industry since 2015. This situation impacted daily operation and production process in every oil company in the world. PT. Cipher Pol Indonesia as world class and one of the largest oil company in the world also forced to do adjustment to achieve more efficient and effective operation. Loss Production Opportunity (LPO) is one of production operation component that occurred in daily basis. LPO quantify amount of oil that loss Dorieng operation process. The more LPO occurred, the less company revenue generated from daily operation. LPO could come from rig operation and rigless operation. One of rigless operation that causing LPO is due to polish rod failure that need to be replaced with the new one using rigless unit. Not all change polish rod job is successful. Some of them also failed and need rig program to get production well back to production. However, actual condition in the field showing there are some gaps identified related to the delay rig program generation for failed change polish rod job that ultimately increase LPO. The delay in generating rig program for failed CPR job causing 3,731 barrel oil additional LPO from January 2018 – July 2020. Through this research, project team try to identify root cause from business problem and develop project implementation plan to solve the business problem. Lean Sigma DMAIC methodology are adopted as conceptual framework. Cross functional team as project team implement step by step from lean sigma method and held several sessions of brainstorming meeting. In root cause analysis, project team using FiveWhy and Waste Analysis method as guidance to determine problem root cause and generate alternatives. The information delay from operator/rigless crew about failed change polish rod job was identified as root cause problem. From root cause analysis, project team identified two possible alternatives using Kepner- Tregoe Decision Analysis methodology. The best alternative is chosen based on Must & Want criteria in which Must criteria is Transfer-able to the new block operator while Want criteria is based on: Relevancy with Root Cause, Low Cost, High Impact, and Easy to Execute. Database Integration and Synchronization to trigger Exception Signal into web-based dashboard is chosen as the best alternative to be implemented with total score of 99. Through this project, project team aim to save ~612 $ per day or 223.4 MUSD yearly.
format Theses
author Nur Hasan, Wahyuda
author_facet Nur Hasan, Wahyuda
author_sort Nur Hasan, Wahyuda
title FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
title_short FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
title_full FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
title_fullStr FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
title_full_unstemmed FAILED CHANGE POLISH ROD LPO IMPROVEMENT USING LEAN SIGMA METHOD
title_sort failed change polish rod lpo improvement using lean sigma method
url https://digilib.itb.ac.id/gdl/view/57384
_version_ 1822930453533818880