DESIGN OPTIMIZATION OF GOLD ORE MINING PT XYZ
Gold mineral is a non-renewable resource, and the mineral mining process must be planned with the principle of pit optimization. Mining optimization for mineral reserves can be done by minimizing the amount of waste to obtain much ore that can be mined. PT XYZ is one of the gold mining companies...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/57523 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |