OPERATING COST & TIME IMPROVEMENT FOR SQUEEZE CEMENTING DURING WORKOVER ACTIVITIES TO IMPROVE OPERATIONAL BUSINESS METRICS
The Rokan Oil Company (ROC) is one of the largest energy company's in Indonesia. ROC always tries to make the most of the energy sources in Rokan's block, the old fields and have been produced from ancient times in the right way, taking advantage of innovative technology, can seize new opp...
Saved in:
Main Author: | Huuriyah, Qisthi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/57768 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
WORKOVER OPERATION IMPROVEMENT FOR WELLS WITH HIGH WELLHEAD ELEVATION AT âHUMAIRAâ AREA
by: Budi Rudiantoro, Agung -
OPERATIONAL COST & TIME IMPROVEMENT FOR WIPER TRIP ACTIVITIES DURING DRILLING OPERATION BY USING LEAN SIX SIGMA AT PT. RKN
by: Fadhlan Kasyifi, Anugrah -
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
OPTIMIZATION OF DRILLING PARAMETER IN DRILLING OUT CEMENT ACTIVITY TO IMPROVE WORKOVER PERFORMANCE USING DESIGN OF EXPERIMENT (CASE STUDY: PT BOS*)
by: Yudi Permana, Didit -
WORKOVER AND WELL SERVICE PERFORMANCE IMPROVEMENT USING LEAN SIX SIGMA CASE STUDY: WORKOVER AND WELL SERVICE ACTIVITY OF PT AAA
by: Adi Prasetyo, Bayu