IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO

Maxtekno is an IT service company that has a headquarter in Singapore. They are one of the companies that opens job vacancies even during the pandemic. In 2020 itself, there are 7.416 candidates that applied to Maxtekno, but only 153 candidates were recruited. With the huge number of candidates,...

Full description

Saved in:
Bibliographic Details
Main Author: Prasetyo Arso, Damon
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/57953
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:57953
spelling id-itb.:579532021-08-28T12:13:17ZIMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO Prasetyo Arso, Damon Manajemen umum Indonesia Theses agile methodology, low-code, recruitment platform, scrum. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/57953 Maxtekno is an IT service company that has a headquarter in Singapore. They are one of the companies that opens job vacancies even during the pandemic. In 2020 itself, there are 7.416 candidates that applied to Maxtekno, but only 153 candidates were recruited. With the huge number of candidates, the HR team needs a system that simplify their work. Unfortunately, the current system and process is still too complicated and requires too much manual processes. The aim of this study is to propose an improvement for the current recruitment application for Maxtekno so that the work capacity of the HR team can be increased and the recruitment process can be accelerated. To do so, this study also aims to gather requirement for the improved recruitment application, validate the fulfillment of requirement based on the design and the prototype created, and to gather feedback from the users for the next iteration. The scrum methodology also aimed to be review in this study on how it affects the development. The research methodology being used in this study is qualitative research. The first interview phase is with the HR team to gather the business issue and the root cause of the issue. The second interview phase is done to gather requirements from the users, they are HR team members, interviewers, and candidates. Feasibility and difficulty assessment also done in the second interview phase by interviewing the developer team. Third interview phase is conducted during sprint review. Each of the user is interviewed to validate the requirement fulfillment based on the design and prototype and feedback for next iteration is gathered. The development team members are also interviewed to assess the effect of scrum methodology in the development As a result of this research, a revamp of the recruitment platform is proposed so to tackle the root cause which is to provide scoring form and to have automation method to follow-up candidates. The requirement of the application is mainly to centralize the end-to-end recruitment process and to have automation features. After the prototype is created, the users sees that the product could solve the problems and fulfill the users’ needs. For the next iterations, the team will develop acceptance sheet, reorder the form fields in the recruitment platform, provide submission page for the candidate and develop notification after status change in the candidate. The development team sees that scrum methodology allows flexibility with measurable progress in the development. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Prasetyo Arso, Damon
IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
description Maxtekno is an IT service company that has a headquarter in Singapore. They are one of the companies that opens job vacancies even during the pandemic. In 2020 itself, there are 7.416 candidates that applied to Maxtekno, but only 153 candidates were recruited. With the huge number of candidates, the HR team needs a system that simplify their work. Unfortunately, the current system and process is still too complicated and requires too much manual processes. The aim of this study is to propose an improvement for the current recruitment application for Maxtekno so that the work capacity of the HR team can be increased and the recruitment process can be accelerated. To do so, this study also aims to gather requirement for the improved recruitment application, validate the fulfillment of requirement based on the design and the prototype created, and to gather feedback from the users for the next iteration. The scrum methodology also aimed to be review in this study on how it affects the development. The research methodology being used in this study is qualitative research. The first interview phase is with the HR team to gather the business issue and the root cause of the issue. The second interview phase is done to gather requirements from the users, they are HR team members, interviewers, and candidates. Feasibility and difficulty assessment also done in the second interview phase by interviewing the developer team. Third interview phase is conducted during sprint review. Each of the user is interviewed to validate the requirement fulfillment based on the design and prototype and feedback for next iteration is gathered. The development team members are also interviewed to assess the effect of scrum methodology in the development As a result of this research, a revamp of the recruitment platform is proposed so to tackle the root cause which is to provide scoring form and to have automation method to follow-up candidates. The requirement of the application is mainly to centralize the end-to-end recruitment process and to have automation features. After the prototype is created, the users sees that the product could solve the problems and fulfill the users’ needs. For the next iterations, the team will develop acceptance sheet, reorder the form fields in the recruitment platform, provide submission page for the candidate and develop notification after status change in the candidate. The development team sees that scrum methodology allows flexibility with measurable progress in the development.
format Theses
author Prasetyo Arso, Damon
author_facet Prasetyo Arso, Damon
author_sort Prasetyo Arso, Damon
title IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
title_short IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
title_full IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
title_fullStr IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
title_full_unstemmed IMPLEMENTATION OF AGILE DEVELOPMENT METHODOLOGY USING CASE STUDY: RECRUITMENT APPLICATION REVAMP OF MAXTEKNO
title_sort implementation of agile development methodology using case study: recruitment application revamp of maxtekno
url https://digilib.itb.ac.id/gdl/view/57953
_version_ 1822002806243983360