ANALISIS KEGAGALAN DAN DESAIN PERBAIKAN SUPPLY PRESSURE CONNECTION PADA HIGH STAGE REGULATOR PESAWAT B737-500
Saved in:
Main Author: | Nanda Indriady, Desanta |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/58540 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDI KEGAGALAN KOROSI AFT CARGO DOOR FRAME PADA PESAWAT BOEING SERI 737
by: Adi Putra, Hendra -
ANALISIS KEGAGALAN ENGINE STARTER VALVE MESIN CFM56-3 BOEING 737-300/400/500
by: Kurnia Chandra, Ricky -
ANALISIS KASUS KEGAGALAN SISTEM PENGEREMAN PADA PESAWAT TERBANG DARI DATA FDR STUDI KASUS : PESAWAT BOEING 737-300 KARGO
by: Ramadhan Sastra, Yan -
METODE PENENTUAN PREMI PERAWATAN PESAWAT UDARA KASUS BOEING 737-300\/400\/500 DI GMF-AEROASIA
by: RAHADHYAN, MAHARDIKA -
ANALISIS KEGAGALAN OUTBOARD GROUND SPOILER ACTUATOR PESAWAT\R\NTERBANG BOEING 737-400 GARUDA INDONESIA PK-GWQ
by: S SYAHIED FAUZY, M