PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN

Saved in:
Bibliographic Details
Main Author: Irfan Hilman, Muhammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/58695
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:58695
spelling id-itb.:586952021-09-04T10:53:34ZPERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN Irfan Hilman, Muhammad Indonesia Final Project MT16 INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/58695 text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description
format Final Project
author Irfan Hilman, Muhammad
spellingShingle Irfan Hilman, Muhammad
PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
author_facet Irfan Hilman, Muhammad
author_sort Irfan Hilman, Muhammad
title PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
title_short PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
title_full PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
title_fullStr PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
title_full_unstemmed PERANCANGAN AWAL HOT STRIP MILL DENGAN KAPASITAS PRODUKSI 700.000 TON/TAHUN
title_sort perancangan awal hot strip mill dengan kapasitas produksi 700.000 ton/tahun
url https://digilib.itb.ac.id/gdl/view/58695
_version_ 1822930839421321216