DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW.
ABSTRACT: <br /> <br /> <br /> <br /> <br /> As the company grows, the company can face many problems and the problems in the company grows as well, the organization structure in the company grows complex. The business units in the company are designed to support e...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/5951 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:5951 |
---|---|
spelling |
id-itb.:59512017-09-27T15:30:37ZDESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. Prasetyo (NIM 29105017), Dhenny Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/5951 ABSTRACT: <br /> <br /> <br /> <br /> <br /> As the company grows, the company can face many problems and the problems in the company grows as well, the organization structure in the company grows complex. The business units in the company are designed to support each other activities. If one of the business units suffer the undesired condition, such as the plant stop producing, surely it can disturb other business unit activities in the companies. <br /> <br /> <br /> <br /> <br /> The situation where the plant suddenly stop its production can be caused by many reason, such as natural disaster, fire, machinery breakdown, riots and many others, can not be predicted and inevitable. If these things should happened, the special attention shall be given to this situation to mitigate and to recover the effect of problems, one way is to make risk management. PT. TDW Indonesia is a cosmetic manufacture company belongs to BELLE Corp has a program to mitigate the effects of the undesired situation that can cause the company to stop its production, this plan called Production Cotinuity Plan (PCP). The responsibility to build the PCP was handed to logistic department, because the logistics department is responsible for the flows of materials and finished goods from site to another site. The result of this research and assessment showed the level of severity according to the duration that plant could not produce and the production capacity loss. The focus of this research is on the handling of recovery plan from major disaster or problems and then finalized by creating PCP that shows an integrated documentation consists of three parts, they are : decision matrix, action plan scenario and appendix. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
ABSTRACT: <br />
<br />
<br />
<br />
<br />
As the company grows, the company can face many problems and the problems in the company grows as well, the organization structure in the company grows complex. The business units in the company are designed to support each other activities. If one of the business units suffer the undesired condition, such as the plant stop producing, surely it can disturb other business unit activities in the companies. <br />
<br />
<br />
<br />
<br />
The situation where the plant suddenly stop its production can be caused by many reason, such as natural disaster, fire, machinery breakdown, riots and many others, can not be predicted and inevitable. If these things should happened, the special attention shall be given to this situation to mitigate and to recover the effect of problems, one way is to make risk management. PT. TDW Indonesia is a cosmetic manufacture company belongs to BELLE Corp has a program to mitigate the effects of the undesired situation that can cause the company to stop its production, this plan called Production Cotinuity Plan (PCP). The responsibility to build the PCP was handed to logistic department, because the logistics department is responsible for the flows of materials and finished goods from site to another site. The result of this research and assessment showed the level of severity according to the duration that plant could not produce and the production capacity loss. The focus of this research is on the handling of recovery plan from major disaster or problems and then finalized by creating PCP that shows an integrated documentation consists of three parts, they are : decision matrix, action plan scenario and appendix. |
format |
Theses |
author |
Prasetyo (NIM 29105017), Dhenny |
spellingShingle |
Prasetyo (NIM 29105017), Dhenny DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
author_facet |
Prasetyo (NIM 29105017), Dhenny |
author_sort |
Prasetyo (NIM 29105017), Dhenny |
title |
DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
title_short |
DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
title_full |
DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
title_fullStr |
DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
title_full_unstemmed |
DESIGN AND IMPLEMENTATION OF PRODUCTION CONTINUITY PLAN (PCP) FOR PT. TDW. |
title_sort |
design and implementation of production continuity plan (pcp) for pt. tdw. |
url |
https://digilib.itb.ac.id/gdl/view/5951 |
_version_ |
1820663790020067328 |