IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC

Infrastructure Department of KPC is a business unit which responsible to maintain Infrastructure facilities where all works performed decentralized at the location where the asset located. By limited number of personnel, validation on required works, surveillance of quality and Contractor resources...

Full description

Saved in:
Bibliographic Details
Main Author: Komari, Nurul
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/59619
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:59619
spelling id-itb.:596192021-09-15T08:32:27ZIMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC Komari, Nurul Manajemen umum Indonesia Theses Business Process Re-Engineering, Six-Sigma – DMAIC, Infrastructure Maintenance, Decentralize, Resources and Quality Validation, Enterprise Asset Management, Web Platform, Reporting Automation INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/59619 Infrastructure Department of KPC is a business unit which responsible to maintain Infrastructure facilities where all works performed decentralized at the location where the asset located. By limited number of personnel, validation on required works, surveillance of quality and Contractor resources utilization cannot be conducted. This potential to increase risk of overpayment specifically for the unit rate type of contract where the payment is based on actual material, equipment and manpower usage. In addition, Enterprise Asset Management (EAM) utilization by Company with restricted access for Contractor by the security reason and required documentation lead to longer time period for invoicing process and high administration cost that will finally contribute to the increasing of total cost. The purpose of this study is to obtain a system that can provide actual validation on Contractor used resources including the quality of work and speed up the administrative process in an effort to reduce maintenance costs. Each phase of BPR Business Process Re-engineering (BPR) and Six Sigma - DMAIC are carried out in this research for further comparison to find the best solution. BPR method which focus in redesigning overall process gives additional value for improving other lack of performance part while DMAIC provides more option to solve the problem. Both methods recommend similar solution to combines the company's EAM based platform and web-based application that can calculate total cost of used resources and store data for work quality where the company’s personnel can access it in real time.These job database at the end will generate standardized reports automatically that can be input into the company's EAM with minimum effort. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Komari, Nurul
IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
description Infrastructure Department of KPC is a business unit which responsible to maintain Infrastructure facilities where all works performed decentralized at the location where the asset located. By limited number of personnel, validation on required works, surveillance of quality and Contractor resources utilization cannot be conducted. This potential to increase risk of overpayment specifically for the unit rate type of contract where the payment is based on actual material, equipment and manpower usage. In addition, Enterprise Asset Management (EAM) utilization by Company with restricted access for Contractor by the security reason and required documentation lead to longer time period for invoicing process and high administration cost that will finally contribute to the increasing of total cost. The purpose of this study is to obtain a system that can provide actual validation on Contractor used resources including the quality of work and speed up the administrative process in an effort to reduce maintenance costs. Each phase of BPR Business Process Re-engineering (BPR) and Six Sigma - DMAIC are carried out in this research for further comparison to find the best solution. BPR method which focus in redesigning overall process gives additional value for improving other lack of performance part while DMAIC provides more option to solve the problem. Both methods recommend similar solution to combines the company's EAM based platform and web-based application that can calculate total cost of used resources and store data for work quality where the company’s personnel can access it in real time.These job database at the end will generate standardized reports automatically that can be input into the company's EAM with minimum effort.
format Theses
author Komari, Nurul
author_facet Komari, Nurul
author_sort Komari, Nurul
title IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
title_short IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
title_full IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
title_fullStr IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
title_full_unstemmed IMPROVING SURVEILANCE AND EFFECTIVENESS OF CONTRACT MAINTENANCE IN INFRASTRUCTURE DEPARTMENT OF KPC
title_sort improving surveilance and effectiveness of contract maintenance in infrastructure department of kpc
url https://digilib.itb.ac.id/gdl/view/59619
_version_ 1822003292715089920