STUDI AWAL IMPLEMENTASI RELIABILITY CENTERED MAINTENANCE DIPLTU LABUAN STUDI KASUS: PADA STACKER RECLAIMER TYPE DQL1250/D204
Saved in:
Main Author: | Satriyo, Budi |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60654 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
THE BEGINNING OF RELIABILITY CENTERED MAINTENANCE IMPLEMENTATION (RCM) AT COAL FIRED STEAM GENERATION POWER PLANT (PLTU) LABUAN Case study of Stacker Reclaimer Type DQL 1250/D204
by: SATRIYO (NIM : 23108310); Pembimbing: Prof. DR. Ir. H. Indra Nurhadi, BUDI -
Automated battery plate stacker
by: Fadrigon, Clarisa, et al.
Published: (1998) -
Computer controlled pneumatic canned tuna stacker
by: Alvarez, Francis T., et al.
Published: (1998) -
RESORT-AIRPORT AS THE FACE OF LABUAN BAJO: KOMODO INTERNATIONAL AIRPORT AT LABUAN BAJO, NUSA TENGGARA TIMUR
by: Roseanne, Diona -
INTERACTION OF TIN SMELTING SLAG AND MAGNESIA REFRACTORY AT 1250 AND 1400°C
by: Khoirunnisa