STUDI IMPLEMENTASI RELIABILITY CENTERED MAINTENANCE PADABELT CONVEYOR 13 DAN 14 PLTU SURALAYA 1-4
Saved in:
Main Author: | Abidin, Zainal |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/60655 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPLEMENTATION STUDY OF RELIABILITY CENTERED MAINTENANCE ON BELT CONVEYOR 13 AND 14 SURALAYA POWER PLANT UNIT 1-4
by: ABIDIN (NIM : 23108311); Pembimbing:Prof. Dr. Ir. Indra Nurhadi, ZAINAL -
STUDI IMPLEMENTASI RELIABILITY CENTERED MAINTENANCE (RCM) DI PLTU SURALAYA STUDI KASUS PADA PULVERIZER TYPE MPS-89 N UNIT 57.
by: Zulfadhli -
STUDY OF IMPLEMENTATION OF RELIABILITY CENTERED MAINTENANCE (RCM) IN PLTU SURALAYA A STUDY CASE OF PULVERIZER, MPS-89N TYPE, 5-7 UNITS
by: (NIM : NIM : 23108327); Pembimbing : Prof. Dr. Ir. H. Indra Nurhadi, ZULFADHLI -
ANALISIS RELIABILITY UNTUK MENENTUKAN MEAN TIME BETWEENFAILURE STUDI KASUS PULVERIZER PLTU SURALAYA
by: Desi Anggraeni, Nuha -
RELIABILITY ANALYSIS TO DETERMINED MEAN TIME BETWEEN FAILURE(MTBF) CASE STUDY ON PLTU SURALAYA PULVERIZER
by: DESI ANGGRAENI (NIM : 23108020); Pembimbing : Prof. Dr. Ir. Indra Nurhadi, NUHA