DEVELOPMENT OF CONTRACTOR’S VALUE ENGINEERING IMPLEMENTATION MEASUREMENT MODEL (APPLICATION OF THE MODEL IN THE EPCC PROJECT OF CONTRACTOR PT.X)

VE (value engineering) is a systematic method carried out by a multidisciplinary team in evaluating designs in construction projects to produce life cycle cost (LCC) efficiency while remaining consistent with achieving the required quality. In Indonesia, VE has been implemented by various contrac...

Full description

Saved in:
Bibliographic Details
Main Author: Ng, Andrew
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/61127
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia