PEMBANGUNAN ALAT MONITORING JADWAL PELAKSANAAN PEKERJAAN PADA PROYEK PERANGKAT LUNAK DENGAN DATA GIT
Saved in:
Main Author: | Mujahid Darussalam, Isa |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61520 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PEMBANGUNAN APLIKASI UNTUK MENILAI KONTRIBUSI MAHASISWA PADA PROYEK PERANGKAT LUNAK MENGGUNAKAN GIT
by: MUHAMMAD HILMI ACHWIN, 081411631006
Published: (2018) -
MANAJEMEN PROYEK PENGEMBANGAN PERANGKAT LUNAK: Studi Kasus Proyek Pengembangan Perangkat Lunak Sistem Trim Rudder Otomatis
by: Imam Gunawan, Mohamad -
ANALISIS KAPASITAS PRODUKSI ALAT BERAT DAN PELAKSANAAN PEKERJAAN STRUKTUR PIER R2
PROYEK PEMBANGUNAN FLYOVER JOMBOR YOGYAKARTA
by: , SOBITA MARCHKY PERMATASARI, et al.
Published: (2013) -
PERANGKAT LUNAK BANTU EKTRAKSI DATA
by: Anam Alghozali, Khoirul -
LINGKUNGAN PEMBANGUNAN PERANGKAT LUNAK MENGGUNAKAN METODOLOGI OPEN SOURCE
by: Satria Perdana, Riza