DESIGN OF PILE, OPRIT, AND ABUTMENT AT FLYOVER AND RETAINING WALL AT UNDERPASS FOR NON LEVEL INTERSECTION ON JALAN PEMUDA DKI JAKARTA
On Jalan Pemuda DKI Jakarta, non level intersection will be designed which include flyover and underpass. Based on soil and environmental conditions around the site, a bored pile will be used to support the piers on the flyover, abutment, and piers on the underpass structure. Pile analysis includes...
Saved in:
Main Author: | Hanif, Abdurrahman |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61624 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN RETAINING WALL FOR UNDERPASS AND BORED PILE FOUNDATIONS OF JOYOBOYO INTERMODAL STATION SURABAYA
by: Aji Bagaskoro, Yuwono -
Jacked pipes as retaining wall in underpass construction
by: Jaysankar, R.
Published: (2008) -
DESIGN OF FOUNDATION AND RETAINING WALL ON THE UNDERPASS OF JOYOBOYO INTERMODAL STATION
by: BUDI PRAKOSO - NIM : 15013017 , NICO -
Study of Design Build Project Delivery Implementation on Flyover Project in DKI Jakarta (Case Study: Flyover Pancoran)
by: SURYO PRIYO JATMIKO - NIM: 25015006, ADI -
PERANCANGAN GEOMETRIK JALAN, PERKERASAN JALAN, DAN MANAJEMEN LALU LINTAS SIMPANG TAK SEBIDANG DI JALAN PEMUDA DKI JAKARTA
by: Dheyanda Putri, Anggi