STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA
Indonesia has very diverse rain characteristics. Indonesia is a country that has a high rainfall. This characteristics will distract the stability of the mine and the operation of mine. To solve this problem so important to characterize the rain to optimized or good mine drainage system, especial...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61896 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:61896 |
---|---|
spelling |
id-itb.:618962021-09-28T10:55:10ZSTUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA Eky Hermawan, Andre Indonesia Final Project Characterization, duration, probability, rainfall, daily rain, ekstreme INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/61896 Indonesia has very diverse rain characteristics. Indonesia is a country that has a high rainfall. This characteristics will distract the stability of the mine and the operation of mine. To solve this problem so important to characterize the rain to optimized or good mine drainage system, especially for the Green Stone Area. This study aims to determine the cumulative percentage of daily rainfall for a certain duration and its effect on the instensity of short duration rain and how does the characteristic of duration affect mining operation activities. This analysis was performed by using MS Excel and SPSS Sofware. This Analysis was carried out by determining the probability of rain for each duration and how does the characteristic of duration affect mining operation actiivities. At Green Stone Mining, 100% daily rainfall occurs for a duration of 2 hours or it’s a short duration.. At the Green Stone Mining, dominant rainfall will dominant at 12:00 to 16:00 with a total value 37.5% of daily rain events and total value of 47.45% of total daily rainfall. Therfore, in the period 12-18 it is not optimal for mining operations to be carried out. In extreme rain intensity, for duration 10 minutes, the probability is 27.61%, for duration 30 minutes, the probability is 56.67%, and for duration 60 minutes, the probability is 77.75%. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Indonesia has very diverse rain characteristics. Indonesia is a country that has a
high rainfall. This characteristics will distract the stability of the mine and the
operation of mine. To solve this problem so important to characterize the rain to
optimized or good mine drainage system, especially for the Green Stone Area. This
study aims to determine the cumulative percentage of daily rainfall for a certain
duration and its effect on the instensity of short duration rain and how does the
characteristic of duration affect mining operation activities. This analysis was
performed by using MS Excel and SPSS Sofware. This Analysis was carried out by
determining the probability of rain for each duration and how does the
characteristic of duration affect mining operation actiivities. At Green Stone
Mining, 100% daily rainfall occurs for a duration of 2 hours or it’s a short
duration.. At the Green Stone Mining, dominant rainfall will dominant at 12:00 to
16:00 with a total value 37.5% of daily rain events and total value of 47.45% of
total daily rainfall. Therfore, in the period 12-18 it is not optimal for mining
operations to be carried out. In extreme rain intensity, for duration 10 minutes, the
probability is 27.61%, for duration 30 minutes, the probability is 56.67%, and for
duration 60 minutes, the probability is 77.75%. |
format |
Final Project |
author |
Eky Hermawan, Andre |
spellingShingle |
Eky Hermawan, Andre STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
author_facet |
Eky Hermawan, Andre |
author_sort |
Eky Hermawan, Andre |
title |
STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
title_short |
STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
title_full |
STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
title_fullStr |
STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
title_full_unstemmed |
STUDY OF RAIN CHARACTERISTICS BY DURATION OF DAILY RAIN BASED ON A GREEN STONE MINING AREA PT AMMAN MINERAL NUSA TENGGARA |
title_sort |
study of rain characteristics by duration of daily rain based on a green stone mining area pt amman mineral nusa tenggara |
url |
https://digilib.itb.ac.id/gdl/view/61896 |
_version_ |
1822003959100866560 |