RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI
The Temesi TPA Recycling Center is located in Temesi, Gianyar Regency, Bali Province. TPA Temesi accommodates waste from areas in Gianyar Regency with the amount of waste generated 198.96 tons/day or 602.90 m3/day with a conveyance density of 0.33 tons/m3 (PT. LAPI ITB, 2020). The projected percenta...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/61913 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:61913 |
---|---|
spelling |
id-itb.:619132021-09-28T12:08:49ZRECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI Safitri, Savira Indonesia Final Project PDU planning, recycling centers, selected alternatives, waste management, waste generation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/61913 The Temesi TPA Recycling Center is located in Temesi, Gianyar Regency, Bali Province. TPA Temesi accommodates waste from areas in Gianyar Regency with the amount of waste generated 198.96 tons/day or 602.90 m3/day with a conveyance density of 0.33 tons/m3 (PT. LAPI ITB, 2020). The projected percentage of waste that enters the Temesi TPA is 61.02% (October 2020). The existing condition of waste management at TPA Temesi is a waste processing facility named Integrated Waste Processing Facility (FPST) with a processing capacity of 27.47 tons/day. From this, there will be the addition of new facilities at the Temesi TPA, namely the Temesi TPA Recycling Center (PDU), so that the amount of waste managed is increased, to reduce the acceleration of the Temesi TPA landfill closure and increase the life of the landfill. After selecting the PDU design, the capacity of the PDU to be designed is 50 tons/day with a solid waste management system for the selected service management scenario with a moderate system. For sorting the source system, the moderate system was chosen. Then, for the processing process, the waste sorting at the PDU uses a semi-mechanical system, with a selected organic processing system using Black Soldier Fly, and for processing inorganic waste the first alternative, namely Compact Paper and metal selling, Making plastic pellets, compacting plastic waste. sell, waste incineration is not sold. The area needed to build the PDU is 3112 m2 of the total available land, which is 3236 m2. The total development budget (CAPEX) needed to build the PDU at the Temesi TPA is Rp. 8,933,102.00. With a total PDU building area of 3236 m2. Thus, the cost of building the Temesi TPA PDU is Rp 2,509,580.00/m2. Then, for the operational cost budget that is designed, it is Rp. 4,094,459,360.00. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The Temesi TPA Recycling Center is located in Temesi, Gianyar Regency, Bali Province. TPA Temesi accommodates waste from areas in Gianyar Regency with the amount of waste generated 198.96 tons/day or 602.90 m3/day with a conveyance density of 0.33 tons/m3 (PT. LAPI ITB, 2020). The projected percentage of waste that enters the Temesi TPA is 61.02% (October 2020). The existing condition of waste management at TPA Temesi is a waste processing facility named Integrated Waste Processing Facility (FPST) with a processing capacity of 27.47 tons/day. From this, there will be the addition of new facilities at the Temesi TPA, namely the Temesi TPA Recycling Center (PDU), so that the amount of waste managed is increased, to reduce the acceleration of the Temesi TPA landfill closure and increase the life of the landfill. After selecting the PDU design, the capacity of the PDU to be designed is 50 tons/day with a solid waste management system for the selected service management scenario with a moderate system. For sorting the source system, the moderate system was chosen. Then, for the processing process, the waste sorting at the PDU uses a semi-mechanical system, with a selected organic processing system using Black Soldier Fly, and for processing inorganic waste the first alternative, namely Compact Paper and metal selling, Making plastic pellets, compacting plastic waste. sell, waste incineration is not sold. The area needed to build the PDU is 3112 m2 of the total available land, which is 3236 m2. The total development budget (CAPEX) needed to build the PDU at the Temesi TPA is Rp. 8,933,102.00. With a total PDU building area of 3236 m2. Thus, the cost of building the Temesi TPA PDU is Rp 2,509,580.00/m2. Then, for the operational cost budget that is designed, it is Rp. 4,094,459,360.00. |
format |
Final Project |
author |
Safitri, Savira |
spellingShingle |
Safitri, Savira RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
author_facet |
Safitri, Savira |
author_sort |
Safitri, Savira |
title |
RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
title_short |
RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
title_full |
RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
title_fullStr |
RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
title_full_unstemmed |
RECYCLING CENTER (PDU) SYSTEM DESIGN AT TPA TEMESI, GIANYAR, BALI |
title_sort |
recycling center (pdu) system design at tpa temesi, gianyar, bali |
url |
https://digilib.itb.ac.id/gdl/view/61913 |
_version_ |
1822276386094579712 |