BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ

PT XYZ faced the needs to collect veterinary vaccine batch number data in its distribution network. The collection time reaches seven (7) days while the ideal is zero (0) day. This issue becomes important because it brings an opportunity cost to the company, which comes from lost sales due to unavai...

Full description

Saved in:
Bibliographic Details
Main Author: Jaya Gunawan, Yosep
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62047
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62047
spelling id-itb.:620472021-10-21T14:18:18ZBATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ Jaya Gunawan, Yosep Manajemen umum Indonesia Theses batch number, distribution network, traceability, operation process INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62047 PT XYZ faced the needs to collect veterinary vaccine batch number data in its distribution network. The collection time reaches seven (7) days while the ideal is zero (0) day. This issue becomes important because it brings an opportunity cost to the company, which comes from lost sales due to unavailable stock and future customer complaints. The question is how to make a real time response possible. Two aspects related to batch number data collection process are traceability and operation process. Interview, data survey, document study, and process simulation are used to find root causes. Analysis lead to the findings of root causes and potential improvement. Three (3) root causes are limited operators, limited storage capacity, and no supporting tools and system for automatic process. Three (3) business solution alternatives are proposed and analyzed. First is to improve traceability system by redesigning the process (A). Second is to implement Automatic Identification and Data Capture (AIDC) Technology (B). Third is to provide sufficient resources, especially operators and storage capacity (C). Decision making uses Analytical Hierarchy Process (AHP). The result is 43.00% for alternative A as the best alternative. This study concludes that preparation and identification are the significant processes, while operators, storage capacity, tools and system are the significant variables. Dealing with one or more of these processes and variables are proved to be effective in reduction of batch number data collection time. Implementation plan for the chosen alternative will include redesigning the process and information system, pilot project, and scale up project. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Jaya Gunawan, Yosep
BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
description PT XYZ faced the needs to collect veterinary vaccine batch number data in its distribution network. The collection time reaches seven (7) days while the ideal is zero (0) day. This issue becomes important because it brings an opportunity cost to the company, which comes from lost sales due to unavailable stock and future customer complaints. The question is how to make a real time response possible. Two aspects related to batch number data collection process are traceability and operation process. Interview, data survey, document study, and process simulation are used to find root causes. Analysis lead to the findings of root causes and potential improvement. Three (3) root causes are limited operators, limited storage capacity, and no supporting tools and system for automatic process. Three (3) business solution alternatives are proposed and analyzed. First is to improve traceability system by redesigning the process (A). Second is to implement Automatic Identification and Data Capture (AIDC) Technology (B). Third is to provide sufficient resources, especially operators and storage capacity (C). Decision making uses Analytical Hierarchy Process (AHP). The result is 43.00% for alternative A as the best alternative. This study concludes that preparation and identification are the significant processes, while operators, storage capacity, tools and system are the significant variables. Dealing with one or more of these processes and variables are proved to be effective in reduction of batch number data collection time. Implementation plan for the chosen alternative will include redesigning the process and information system, pilot project, and scale up project.
format Theses
author Jaya Gunawan, Yosep
author_facet Jaya Gunawan, Yosep
author_sort Jaya Gunawan, Yosep
title BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
title_short BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
title_full BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
title_fullStr BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
title_full_unstemmed BATCH NUMBER DATA COLLECTION ANALYSIS CASE STUDY: PT XYZ
title_sort batch number data collection analysis case study: pt xyz
url https://digilib.itb.ac.id/gdl/view/62047
_version_ 1822003999915638784