#TITLE_ALTERNATIVE#
ABSTRACT: <br /> <br /> <br /> <br /> Daya Max Plus is a regulation which is focusing more on industries to reduce the electrical usage to 50percent at Waktu Beban Puncak, which is from 5p.m. to 10p.m. Although at WBP, industry and household give the biggest contribution a...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/6235 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | ABSTRACT: <br />
<br />
<br />
<br />
Daya Max Plus is a regulation which is focusing more on industries to reduce the electrical usage to 50percent at Waktu Beban Puncak, which is from 5p.m. to 10p.m. Although at WBP, industry and household give the biggest contribution at the time of rapid increase in load. Seen from the amount perspective, the industry is the fewest consumer and households is the biggest consumer. Meanwhile in electrical usage perspective, the industry is the biggest in volume if it is compared to other PT.PLN consumers. This is the reason that the industries are subject to DMP regulation In this case, the writer wants to know how effective is DMP which had been applied since November 2005 until now, and what the impact is after applying DMP for PT. PLN itself and its consumer especially the industry. <br />
<br />
<br />
<br />
The methodology process used in this case is first by collecting raw data that comes from internet and newspaper, and then to analyze them. The measurement tools to see the effectiveness DMP is by using statistical analysis. Then to know the future demand at the time of WBP is by using forecasting method. The writer also makes two scenarios in which where the alteration of electrical demand is influenced by the increase in number of consumers. <br />
<br />
<br />
<br />
Result from statistical analysis shows that there is a difference in peak load increase at WBP before and after applying DMP. While the result of forecasting, it can be seen that after applying DMP, the peak load at WBP decreases but it is accompanied with faster growth rate if it is compared to the time before applying DMP. From scenarios result, it shows that actual electrical demand growth can exceed the forecasted growth. This happen because of the consumer growth plays a major role. Based on these scenarios, the improvement is more focused on industry because the implementation of DMP is solely enforced to industries. |
---|