MINI HYDROPOWER PLANT PLANNING AT SUBDAS CIWIDEY-CUKANGGENTENG

In an effort to increase the electrification ratio, alternative energy gen-eration continues to be encouraged by the government. The potential of water energy can be utilized by the construction of a Micro Hydro Power Plant (MHPP). This generator is suitable to be placed in rural areas. One of them...

Full description

Saved in:
Bibliographic Details
Main Author: TAJRI, RUZIQU
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/62498
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:In an effort to increase the electrification ratio, alternative energy gen-eration continues to be encouraged by the government. The potential of water energy can be utilized by the construction of a Micro Hydro Power Plant (MHPP). This generator is suitable to be placed in rural areas. One of them is Pamekaran Village and Padasuka Village which are the study areas. This MHPP is planned to serve 16,825 residents. This hydropower potential point has a reliable discharge of 10.68 m3/s with a probability of 50% based on the calculation of the N-RECA method. With this discharge, this MHPP can produce 2 x 0.61MW of electric power. The required construction costs are Rp29,812,945,882 with an income of Rp6,609,877,786.27 and obtain an NPV value of Rp8,654,306.021, IRR 14%, BCR 1.29 and PBP for 10 Years 3 Months 10 Days