Abstract: <br /> <br /> <br /> <br /> <br /> Tunneling design before year 1980 usually used empirical method or observational method, and then in practice was accomplished by NATM system. Now the design can be approached more exact by using numerical program of fin...

Full description

Saved in:
Bibliographic Details
Main Author: Hardiman (NIM 250 04 064), Iman
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6262
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:6262
spelling id-itb.:62622017-09-27T15:23:30Z#TITLE_ALTERNATIVE# Hardiman (NIM 250 04 064), Iman Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/6262 Abstract: <br /> <br /> <br /> <br /> <br /> Tunneling design before year 1980 usually used empirical method or observational method, and then in practice was accomplished by NATM system. Now the design can be approached more exact by using numerical program of finite element or finite difference. Using those programs calculation can be executed in three dimensional models. The three dimensional model can accommodate developing exact spreading of displacements and stresses in all axis in rock/soil mass. <br /> <br /> <br /> <br /> <br /> <br /> This research used software program based on finite difference method. It compared tunneling excavation between with no and use reinforcements. The reinforcements are rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1) and rock bolt 1.5 m, shotcrete 20 cm, invert 50 cm (type 2). It means that reinforcement type 2 has more strength than reinforcement type 1. The purpose of this comparison in the research is evaluating the difference of displacements and stresses that might be developed in models. Further can be determined the optimum design of reinforcement for Piyungan - Gading tunnel. <br /> <br /> <br /> <br /> <br /> <br /> The result of this research was found that tunneling excavation at Piyungan-Gading location requires reinforcement. The excavation with no reinforcement produced a large displacement and uncomforted factor of safety. From the comparison of reinforcement was found that the optimum reinforcement for Piyungan-Gading tunnel is rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1). It was concluded from result of calculation of reinforcement rock bolt 1.5 m, shotcrete 20 cm, invert 50 cm (type 2) does not develop the significant difference with rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1). <br /> <br /> <br /> <br /> <br /> <br /> The research did not take into account installation of steel ribs-in field usually placed immediately as a temporary support - and fault in rock mass. Steel ribs usually reduce rate of displacement and maintain stress in higher value, but fault has affect contrary. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract: <br /> <br /> <br /> <br /> <br /> Tunneling design before year 1980 usually used empirical method or observational method, and then in practice was accomplished by NATM system. Now the design can be approached more exact by using numerical program of finite element or finite difference. Using those programs calculation can be executed in three dimensional models. The three dimensional model can accommodate developing exact spreading of displacements and stresses in all axis in rock/soil mass. <br /> <br /> <br /> <br /> <br /> <br /> This research used software program based on finite difference method. It compared tunneling excavation between with no and use reinforcements. The reinforcements are rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1) and rock bolt 1.5 m, shotcrete 20 cm, invert 50 cm (type 2). It means that reinforcement type 2 has more strength than reinforcement type 1. The purpose of this comparison in the research is evaluating the difference of displacements and stresses that might be developed in models. Further can be determined the optimum design of reinforcement for Piyungan - Gading tunnel. <br /> <br /> <br /> <br /> <br /> <br /> The result of this research was found that tunneling excavation at Piyungan-Gading location requires reinforcement. The excavation with no reinforcement produced a large displacement and uncomforted factor of safety. From the comparison of reinforcement was found that the optimum reinforcement for Piyungan-Gading tunnel is rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1). It was concluded from result of calculation of reinforcement rock bolt 1.5 m, shotcrete 20 cm, invert 50 cm (type 2) does not develop the significant difference with rock bolt 1.5 m, shotcrete 10 cm, invert 50 cm (type 1). <br /> <br /> <br /> <br /> <br /> <br /> The research did not take into account installation of steel ribs-in field usually placed immediately as a temporary support - and fault in rock mass. Steel ribs usually reduce rate of displacement and maintain stress in higher value, but fault has affect contrary. <br />
format Theses
author Hardiman (NIM 250 04 064), Iman
spellingShingle Hardiman (NIM 250 04 064), Iman
#TITLE_ALTERNATIVE#
author_facet Hardiman (NIM 250 04 064), Iman
author_sort Hardiman (NIM 250 04 064), Iman
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/6262
_version_ 1820663850000711680