RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK)
Ace Hardware was affected very significantly because Covid19 saw its impact in Q2 2020. The impact of this covid has an impact on finances and it will be very risky if in the future there is a pandemic again so this must be anticipated with preventive measures by analyzing the risks that exist fro...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62723 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:62723 |
---|---|
spelling |
id-itb.:627232022-01-18T10:10:46ZRISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) Ishaq, Fauzan Manajemen umum Indonesia Theses Covid19, Q2 Financial Issues, Risk Management, Payment Gateway, Enhancement Web ruparupa, Technology Finance, e-wallet, Analytical Hierarchy Process. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62723 Ace Hardware was affected very significantly because Covid19 saw its impact in Q2 2020. The impact of this covid has an impact on finances and it will be very risky if in the future there is a pandemic again so this must be anticipated with preventive measures by analyzing the risks that exist from the solutions to be developed and the impact that will occur in some concentrations, project implementation to mitigate this risk, will have several criteria such as cost, implementation, reliability, and maintenance. Project proposals for handling and improving performance in the event of a pandemic in the future include improving websites and various apps, implementing payment gateways, financial technology that will help automatically collect data or financial records, and can create e-wallets. The biggest expense that Ace Hardware made during Q2 is this very large spending problem will become a very big problem when Ace's assets and income are reduced, Therefore, we offer various solutions to reduce expenses so that we can be more efficient. For Ace Hardware finances, expenditures that are too large can be seen in one of the points, namely "Cash Paid to Employee" because "Long Term Post-employment Liabilities" of 655.439,592,400 are the impact of PSAK 24, As for "Long Term Lease Liabilities" and " Hak Guna Assets" which are Ace Hardware's basic needs, are one of Ace Hardware's basic needs because in sales they rent out space in many malls throughout Indonesia and this is the biggest impact of PSAK 73, Operational Expenses are one of the biggest expenses for several points and it can be seen in the financial report that there are expense points that make operations the largest expenditure of Salaries, Bonuses, and Employee Benefits, Depreciation of Right of Use Assets and we can see the details Notes, Maintenance. Therefore the author wants to mitigate risk by providing a digital solution project using risk management ISO 31000 and using (Analytic Hierarchy Process ) AHP to determine which project is the best to implement first so that it can minimize the risks that exist in digital project solutions and the project can run as expected by Ace Hardware. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Ishaq, Fauzan RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
description |
Ace Hardware was affected very significantly because Covid19 saw its impact in Q2 2020. The impact
of this covid has an impact on finances and it will be very risky if in the future there is a pandemic again
so this must be anticipated with preventive measures by analyzing the risks that exist from the solutions
to be developed and the impact that will occur in some concentrations, project implementation to
mitigate this risk, will have several criteria such as cost, implementation, reliability, and maintenance.
Project proposals for handling and improving performance in the event of a pandemic in the future
include improving websites and various apps, implementing payment gateways, financial technology
that will help automatically collect data or financial records, and can create e-wallets.
The biggest expense that Ace Hardware made during Q2 is this very large spending problem will
become a very big problem when Ace's assets and income are reduced, Therefore, we offer various
solutions to reduce expenses so that we can be more efficient. For Ace Hardware finances, expenditures
that are too large can be seen in one of the points, namely "Cash Paid to Employee" because "Long
Term Post-employment Liabilities" of 655.439,592,400 are the impact of PSAK 24, As for "Long Term
Lease Liabilities" and " Hak Guna Assets" which are Ace Hardware's basic needs, are one of Ace
Hardware's basic needs because in sales they rent out space in many malls throughout Indonesia and
this is the biggest impact of PSAK 73, Operational Expenses are one of the biggest expenses for several
points and it can be seen in the financial report that there are expense points that make operations the
largest expenditure of Salaries, Bonuses, and Employee Benefits, Depreciation of Right of Use Assets
and we can see the details Notes, Maintenance.
Therefore the author wants to mitigate risk by providing a digital solution project using risk management
ISO 31000 and using (Analytic Hierarchy Process ) AHP to determine which project is the best to
implement first so that it can minimize the risks that exist in digital project solutions and the project can
run as expected by Ace Hardware. |
format |
Theses |
author |
Ishaq, Fauzan |
author_facet |
Ishaq, Fauzan |
author_sort |
Ishaq, Fauzan |
title |
RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
title_short |
RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
title_full |
RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
title_fullStr |
RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
title_full_unstemmed |
RISK MANAGEMENT OF ACE HARDWARE DIGITAL SOLUTIONS USING ANALYTICAL HIERARCHY PROCESS (AHP) METHOD (CASE STUDY: PT ACE HARDWARE INDONESIA TBK) |
title_sort |
risk management of ace hardware digital solutions using analytical hierarchy process (ahp) method (case study: pt ace hardware indonesia tbk) |
url |
https://digilib.itb.ac.id/gdl/view/62723 |
_version_ |
1822004157235593216 |