COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING

Coal hauling is like the vein of the coal mining process that connects pit and port. PT ABC has problems in hauling coal from the pit mining area to the port facility so that the actual volume is below the planned capacity. This condition impact barging delay, mining sequence problem, and financi...

Full description

Saved in:
Bibliographic Details
Main Author: Fajar Nugraha, Riyandana
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62827
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62827
spelling id-itb.:628272022-01-20T10:11:13ZCOAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING Fajar Nugraha, Riyandana Manajemen umum Indonesia Theses decision making, coal hauling, improvement plan, SMART INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62827 Coal hauling is like the vein of the coal mining process that connects pit and port. PT ABC has problems in hauling coal from the pit mining area to the port facility so that the actual volume is below the planned capacity. This condition impact barging delay, mining sequence problem, and financial loss. The gap between actual hauling production and equipment capacity is caused by several factors, including equipment performance, low productivity, road conditions, dumping conditions, and loading points. The company must have an excellent improvement strategy, especially for the hauling management system. This final project aims to explore improvement plans for the coal hauling problems using the Simple Multi Attribute Rating Technique (SMART) methodology as a tool for the decision-making process. The implementation plan will focus on stakeholder analysis, risk and contingency plan, and project schedule estimates. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Fajar Nugraha, Riyandana
COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
description Coal hauling is like the vein of the coal mining process that connects pit and port. PT ABC has problems in hauling coal from the pit mining area to the port facility so that the actual volume is below the planned capacity. This condition impact barging delay, mining sequence problem, and financial loss. The gap between actual hauling production and equipment capacity is caused by several factors, including equipment performance, low productivity, road conditions, dumping conditions, and loading points. The company must have an excellent improvement strategy, especially for the hauling management system. This final project aims to explore improvement plans for the coal hauling problems using the Simple Multi Attribute Rating Technique (SMART) methodology as a tool for the decision-making process. The implementation plan will focus on stakeholder analysis, risk and contingency plan, and project schedule estimates.
format Theses
author Fajar Nugraha, Riyandana
author_facet Fajar Nugraha, Riyandana
author_sort Fajar Nugraha, Riyandana
title COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
title_short COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
title_full COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
title_fullStr COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
title_full_unstemmed COAL HAULING IMPROVEMENT AT BENGALON AREA PT ABC: DECISION MAKING
title_sort coal hauling improvement at bengalon area pt abc: decision making
url https://digilib.itb.ac.id/gdl/view/62827
_version_ 1822932026390478848