OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY

Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Disco...

Full description

Saved in:
Bibliographic Details
Main Author: HAMID, HAMIDI
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/62940
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:62940
spelling id-itb.:629402022-01-21T19:23:00ZOPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY HAMID, HAMIDI Manajemen umum Indonesia Theses Capital Budgeting, Investment Evaluation, Sensitivity Analysis, Monte Carlo Simulation, uncertainty INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62940 Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained that a positive NPV of 280.649, an IRR of 8,10% greater than the WACC of 4,21%, while the DPI of 1.25 and PBP of 3,25 years was faster than the duration of the 5 (five) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,17% meanwhile probability NPV>0 is 99,83%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are factors that are sensitive to project feasibility. From the results of the above calculations, it can be concluded that Optimization Of Gas Pipeline Utilization For Section 2 Pemping – Tanjung Uncang With The Provision Of Mini LNG Plant For Karimun Regency is Eligible to be accepted. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
HAMID, HAMIDI
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
description Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained that a positive NPV of 280.649, an IRR of 8,10% greater than the WACC of 4,21%, while the DPI of 1.25 and PBP of 3,25 years was faster than the duration of the 5 (five) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,17% meanwhile probability NPV>0 is 99,83%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are factors that are sensitive to project feasibility. From the results of the above calculations, it can be concluded that Optimization Of Gas Pipeline Utilization For Section 2 Pemping – Tanjung Uncang With The Provision Of Mini LNG Plant For Karimun Regency is Eligible to be accepted.
format Theses
author HAMID, HAMIDI
author_facet HAMID, HAMIDI
author_sort HAMID, HAMIDI
title OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
title_short OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
title_full OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
title_fullStr OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
title_full_unstemmed OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING – TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
title_sort optimization of gas pipeline utilization for section 2 pemping – tanjung uncang with the provision of mini lng plant for karimun regency
url https://digilib.itb.ac.id/gdl/view/62940
_version_ 1822932051379093504