OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY
Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Disco...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/62940 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:62940 |
---|---|
spelling |
id-itb.:629402022-01-21T19:23:00ZOPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY HAMID, HAMIDI Manajemen umum Indonesia Theses Capital Budgeting, Investment Evaluation, Sensitivity Analysis, Monte Carlo Simulation, uncertainty INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/62940 Investment evaluation is a crucial part before investment decision in order to measure will the project generate profit for the company. There are four Capital Budgeting technique use to measure this investment evaluation in this project Net Present Value (NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback Period (PBP). From the evaluation, it was obtained that a positive NPV of 280.649, an IRR of 8,10% greater than the WACC of 4,21%, while the DPI of 1.25 and PBP of 3,25 years was faster than the duration of the 5 (five) year contract. Monte Carlo simulation used 1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this project is 0,17% meanwhile probability NPV>0 is 99,83%. In the sensitivity analysis, it is found that the increase in the cost of capital and the duration of the agreement are factors that are sensitive to project feasibility. From the results of the above calculations, it can be concluded that Optimization Of Gas Pipeline Utilization For Section 2 Pemping – Tanjung Uncang With The Provision Of Mini LNG Plant For Karimun Regency is Eligible to be accepted. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum HAMID, HAMIDI OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
description |
Investment evaluation is a crucial part before investment decision in order to measure
will the project generate profit for the company. There are four Capital Budgeting
technique use to measure this investment evaluation in this project Net Present Value
(NPV), Internal Rate Return (IRR), Discounted Probability Index (DPI) and Payback
Period (PBP).
From the evaluation, it was obtained that a positive NPV of 280.649, an IRR of 8,10%
greater than the WACC of 4,21%, while the DPI of 1.25 and PBP of 3,25 years was
faster than the duration of the 5 (five) year contract. Monte Carlo simulation used
1.000 times to calculate Probability NPV<0 with result Probability NPV<0 in this
project is 0,17% meanwhile probability NPV>0 is 99,83%.
In the sensitivity analysis, it is found that the increase in the cost of capital and the
duration of the agreement are factors that are sensitive to project feasibility.
From the results of the above calculations, it can be concluded that Optimization Of
Gas Pipeline Utilization For Section 2 Pemping – Tanjung Uncang With The Provision
Of Mini LNG Plant For Karimun Regency is Eligible to be accepted. |
format |
Theses |
author |
HAMID, HAMIDI |
author_facet |
HAMID, HAMIDI |
author_sort |
HAMID, HAMIDI |
title |
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
title_short |
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
title_full |
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
title_fullStr |
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
title_full_unstemmed |
OPTIMIZATION OF GAS PIPELINE UTILIZATION FOR SECTION 2 PEMPING â TANJUNG UNCANG WITH THE PROVISION OF MINI LNG PLANT FOR KARIMUN REGENCY |
title_sort |
optimization of gas pipeline utilization for section 2 pemping â tanjung uncang with the provision of mini lng plant for karimun regency |
url |
https://digilib.itb.ac.id/gdl/view/62940 |
_version_ |
1822932051379093504 |