IN SEARCH OF FAVORABLE BUSINESS INVESTMENT AND OPERATION METHODOLOGY IN DEVELOPING GEOTHERMAL ELECTRICITY IN INDONESIA
Indonesia is blessed with abundance of geothermal energy potential. Ministry of Energy and Mineral Resources estimated that the potential for geothermal in Indonesia is around 23.9 GW. Meanwhile, as of November 2021, total installed capacity for geothermal power plant in Indonesia is only 2.1 GW (9%...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63016 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |