SMART APPROACH TO DETERMINE SOLUTION OF COAL QUALITY DISCREPANCY IN COAL-FIRED POWER PLANT PROJECT UNDER BINDING PROJECT FINANCE SCHEME (CASE STUDY: PT SEMANGAT BERJUANG TERUS)
The research aims to determine the best decision that shall be made in order to mitigate the impact that caused by the coal quality non-conformity with the coal supply agreement during commissioning stage towards the coal-fired power plant project development that has been delayed. Since the develop...
Saved in:
Main Author: | Iman Ramadhan, Matiinu |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/63494 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REDESIGN OF COAL SHED AT JAWA 9 & 10 COAL FIRED STEAM POWER PLANT PROJECT
by: Alfarazi, Muhammad -
RISK ALLOCATION IN PROJECT FINANCE: A CASE STUDY OF THE 2X100 MW COAL-FIRED POWER PLANT PROJECT IN KALIMANTAN
by: Ansari NS, Roni -
A project feasibility study on the conversion of cement kilns from oil to coal firing
by: Soriano, Marcelino Q.
Published: (1978) -
FINANCIAL ANALYSIS OF 1Ã200 MW COAL BIOMASS COâ FIRING POWER PLANT EXPANSION PROJECT
by: Dimas Fhadjrin, Reynaldi -
LOCATION MODEL OF COAL BLENDING FACILITIES TO ENSURE COAL SUPPLY FOR COAL FIRED POWER PLANTS IN JAVA ISLAND
by: Ikhsan Pratama, Hanif