STUDI SIMULASI METODE DELIQUIFIKASI PADA SUMUR GAS DENGAN METODE DUAL-TUBING LIFTING
Deliquification is a solving method for liquid loading in gas well which alaways happen when the gas well have pressure and temperature depletion. The depletion of pressure trigger the gas condensation in gas well which is the condensate acumulated and blocks the gas flow in bottom hole. Another sou...
Saved in:
Main Author: | Ahmad Firdaus, Imam |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/63889 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMISASI GAS LIFT DENGAN DEEP GAS LIFT (DGL) PADA SUMUR SID-01
by: Dian Nur Salma, Alfia -
STUDI LABORATORIUM : ANALISA ALIRAN DUA FASA DENGAN MENGGUNAKAN APLIKASI JET GAS LIFT PADA METODE SMALL TUBE LIQUID-LIFTING TECHNIQUE UNTUK PENANGGULANGAN LIQUID LOADING
by: Aditya, Wisnu -
OPTIMUM DESAIN INJEKSI GAS LIFT UNTUK MENINGKATKAN PERFORMA SUMUR X
by: Umaryono, Itto -
ANALISIS PERFORMA SUMUR GAS DENGAN METODE ANSAH DENGAN VARIABEL BOTTOM HOLE PRESSURE
by: Abdurrahman Nafis, Naufal -
PENERAPAN METODE EQUAL SLOPE UNTUK MENGALOKASIKAN LAJU INJEKSI GAS LIFT UNTUK BEBERAPA SUMUR DI LAPANGAN A, LAPANGAN B, DAN LAPANGAN C
by: Manuel Widjaja, Tan