PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG
Lately, infrastructure development in Indonesia has increased rapidly coupled with government policies that focus on infrastructure development. From 2015 to 2019, 1000 km of toll roads have been built all over the country. To support this development, suppliers are needed who are able to supply...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/63926 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:63926 |
---|---|
spelling |
id-itb.:639262022-03-23T12:13:11ZPRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG Eldwin Manajemen umum Indonesia Theses Andesite, Business Process Analysis, FSN Analysis, Production Capacity INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/63926 Lately, infrastructure development in Indonesia has increased rapidly coupled with government policies that focus on infrastructure development. From 2015 to 2019, 1000 km of toll roads have been built all over the country. To support this development, suppliers are needed who are able to supply appropriate and sufficient raw materials. PT Andesite Company is a company that produces andesite materials. PT Andesite Company has a crushing plant with a maximum capacity of 250 tph. PT Andesite Company produces several types of andesite aggregates according to market needs. Based on a production review during 2021, the achievement of PT Andesite Company's production capacity is very low. The monthly target only reaches 69% of the tonnage target with a high maintenance and standby rate reaching 43% of the available working hours. With these conditions, PT Andesite Company needs to find out the root cause of the low production capacity. This research aims to find out the root of the problem and find ways to maintain the achievement of production capacity. This research is done by conducting focus group discussions to find out the root cause. It is known that there are 4 important points that become the root cause of this condition. They are grouped into 4 namely materials, machines, manpower, and methods. Through this research, it is known that in order to improve and maintain the achievement of production capacity there are several things that need to be done, including making an integration system (Andesite Company Information Center / ACIC) to improve communication within PT Andesite Company, adding spare parts storage warehouses, conducting FSN analysis to find out the level of use of spare parts, followed by conditioning preventive maintenance, then making a min-max regulation to control inventory levels, creating a vendor database to make it easier to find vendors, redesigning the purchasing process and entering into supply contracts with suppliers. By making these improvements, PT Andesite Company can increase the achievement of production capacity and maintain this achievement. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Eldwin PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
description |
Lately, infrastructure development in Indonesia has increased rapidly coupled with
government policies that focus on infrastructure development. From 2015 to 2019,
1000 km of toll roads have been built all over the country. To support this
development, suppliers are needed who are able to supply appropriate and sufficient
raw materials. PT Andesite Company is a company that produces andesite
materials. PT Andesite Company has a crushing plant with a maximum capacity of
250 tph. PT Andesite Company produces several types of andesite aggregates
according to market needs. Based on a production review during 2021, the
achievement of PT Andesite Company's production capacity is very low. The
monthly target only reaches 69% of the tonnage target with a high maintenance and
standby rate reaching 43% of the available working hours.
With these conditions, PT Andesite Company needs to find out the root cause of
the low production capacity. This research aims to find out the root of the problem
and find ways to maintain the achievement of production capacity. This research is
done by conducting focus group discussions to find out the root cause. It is known
that there are 4 important points that become the root cause of this condition. They
are grouped into 4 namely materials, machines, manpower, and methods. Through
this research, it is known that in order to improve and maintain the achievement of
production capacity there are several things that need to be done, including making
an integration system (Andesite Company Information Center / ACIC) to improve
communication within PT Andesite Company, adding spare parts storage
warehouses, conducting FSN analysis to find out the level of use of spare parts,
followed by conditioning preventive maintenance, then making a min-max
regulation to control inventory levels, creating a vendor database to make it easier
to find vendors, redesigning the purchasing process and entering into supply
contracts with suppliers. By making these improvements, PT Andesite Company
can increase the achievement of production capacity and maintain this achievement.
|
format |
Theses |
author |
Eldwin |
author_facet |
Eldwin |
author_sort |
Eldwin |
title |
PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
title_short |
PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
title_full |
PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
title_fullStr |
PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
title_full_unstemmed |
PRODUCTION CAPACITY ANALYSIS IN PT ANDESITE COMPANY (STONE CRUSHER) BANDUNG |
title_sort |
production capacity analysis in pt andesite company (stone crusher) bandung |
url |
https://digilib.itb.ac.id/gdl/view/63926 |
_version_ |
1822932287829835776 |