PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC

Energy is a strategic need of nations, where oil continues to hold the largest share of the energy mix, accounting for 31.2% of total primary energy consumption. Each country is obliged to guarantee its long-term needs. However, this is not a simple matter when it comes to the current condition o...

Full description

Saved in:
Bibliographic Details
Main Author: Agustian, Hendri
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/63986
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:63986
spelling id-itb.:639862022-03-25T10:57:46ZPROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC Agustian, Hendri Manajemen umum Indonesia Theses Crude Oil Procurement Process, Six Sigma DMAIC, AHP, CVR, Implementation Plan INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/63986 Energy is a strategic need of nations, where oil continues to hold the largest share of the energy mix, accounting for 31.2% of total primary energy consumption. Each country is obliged to guarantee its long-term needs. However, this is not a simple matter when it comes to the current condition of world crude oil reserves which is limited while the world energy consumption is continuing to grow, including Indonesia. This condition will cause the hunt for crude oil will be increasingly difficult. The difficulty of providing proper crude oil to each refinery according to their design configuration will affect to refinery margins due to operational consequences such as operating capacity, product yield, hydrocarbon losses, and mechanical issue. This phenomenon has occurred in PT. XYZ where there are often mismatch between the composition of crude oil desired for the refinery as planned with crude oil obtained from the procurement process. This condition affect to the achievement of margins and lead to the emergence of operational consequences. This research aims to determine the factors that causing the mismatch and provide solution based on the root cause. Through Six Sigma DMAIC method, the problem analysis was carried out and found the root cause of the problem was because of the current procurement strategy implemented is no longer in accordance with the current conditions where the world's crude oil sources are very dwindling while the competition for crude oil hunting is getting tighter. This current strategy tends to limit crude oil options, passive and less flexible in the hunt for crude oil, and tend to lose crude oil which provide better value. Therefore, several strategies proposed as solution, namely Value Based Crude Selection+ Scheme (VBCS+) and Crude Value Relative Scheme (CVR). Furthermore, these two alternative solutions were analyzed using Analytic Hierarchy Process (AHP) with conclusion that CVR is more suitable as solution to improve current business processes. In order to ensure this new strategy will be done and controlled effectively, the Implementation Plan must be developed covering 3 (three) dimensions that need to be managed, namely Process, People and Tools. By implementing this new strategy in accordance with the implementation plan, it is believed that improvements as company expected will be achieved. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Agustian, Hendri
PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
description Energy is a strategic need of nations, where oil continues to hold the largest share of the energy mix, accounting for 31.2% of total primary energy consumption. Each country is obliged to guarantee its long-term needs. However, this is not a simple matter when it comes to the current condition of world crude oil reserves which is limited while the world energy consumption is continuing to grow, including Indonesia. This condition will cause the hunt for crude oil will be increasingly difficult. The difficulty of providing proper crude oil to each refinery according to their design configuration will affect to refinery margins due to operational consequences such as operating capacity, product yield, hydrocarbon losses, and mechanical issue. This phenomenon has occurred in PT. XYZ where there are often mismatch between the composition of crude oil desired for the refinery as planned with crude oil obtained from the procurement process. This condition affect to the achievement of margins and lead to the emergence of operational consequences. This research aims to determine the factors that causing the mismatch and provide solution based on the root cause. Through Six Sigma DMAIC method, the problem analysis was carried out and found the root cause of the problem was because of the current procurement strategy implemented is no longer in accordance with the current conditions where the world's crude oil sources are very dwindling while the competition for crude oil hunting is getting tighter. This current strategy tends to limit crude oil options, passive and less flexible in the hunt for crude oil, and tend to lose crude oil which provide better value. Therefore, several strategies proposed as solution, namely Value Based Crude Selection+ Scheme (VBCS+) and Crude Value Relative Scheme (CVR). Furthermore, these two alternative solutions were analyzed using Analytic Hierarchy Process (AHP) with conclusion that CVR is more suitable as solution to improve current business processes. In order to ensure this new strategy will be done and controlled effectively, the Implementation Plan must be developed covering 3 (three) dimensions that need to be managed, namely Process, People and Tools. By implementing this new strategy in accordance with the implementation plan, it is believed that improvements as company expected will be achieved.
format Theses
author Agustian, Hendri
author_facet Agustian, Hendri
author_sort Agustian, Hendri
title PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
title_short PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
title_full PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
title_fullStr PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
title_full_unstemmed PROPOSED IMPROVEMENT OF CRUDE OIL SUPPLY MANAGEMENT IN PT.XYZ USING SIX SIGMA DMAIC
title_sort proposed improvement of crude oil supply management in pt.xyz using six sigma dmaic
url https://digilib.itb.ac.id/gdl/view/63986
_version_ 1822004440052269056