PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK

Increasing gas demand significantly in Indonesia and its surrounding region in the last decade affects on exploration of gas resources. However, the conventional gas reserves are decreased and more difficult to be found. The alternate gas sources, therefore should be substituted to fullfill the gas...

Full description

Saved in:
Bibliographic Details
Main Author: Anggi Naluriawan Santoso, Ade
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/64090
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:64090
spelling id-itb.:640902022-03-28T15:59:23ZPENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK Anggi Naluriawan Santoso, Ade Pertambangan dan operasi berkaitan Indonesia Final Project artificial neural network, coalbed methane, dewatering time INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64090 Increasing gas demand significantly in Indonesia and its surrounding region in the last decade affects on exploration of gas resources. However, the conventional gas reserves are decreased and more difficult to be found. The alternate gas sources, therefore should be substituted to fullfill the gas demand in the near future. Coalbed methane (CBM) is one of the unconventional gas which main composition is methane which is adsorbed in the matrix of coal and formed during the coalification process. CBM is produced by dewatering process, that is producing the water filled in the cleats inside coal layer to decrease reservoir pressure until desorption pressure is reached. Once desorption pressure is reached, methane released from coal matrix surface and flows through micropore to natural fractures towards the wellbore. This period of water producing is called dewatering time. Dewatering time prediction is very important for developing CBM project because this period of time will affect the value of the project and as the key to efficient gas production from these reservoir. To predict dewatering time, a reservoir engineer occasionally use reservoir simulation. Last research that already conducted by Halim, H (2013) gives an equation to estimate the dewatering time as function of reservoir area, reservoir thickness, fracture porosity, fracture permeability, desorption pressure, reservoir pressure, and bottomhole pressure. This study aims at estimation of dewatering time on Vertical CBM as function of reservoir and coal properties using Artificial Neural Network (ANN) technique. ANN technique is a poweful modelling tool to establish the complex relationship between input parameters and the dewatering time . A total number of data points consist of 335 sets has been used for generating, validating, and testing the ANN model. The best ANN model gives average data errors = 6% and will be compared with the latest equation that gives average data errors = 9%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Pertambangan dan operasi berkaitan
spellingShingle Pertambangan dan operasi berkaitan
Anggi Naluriawan Santoso, Ade
PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
description Increasing gas demand significantly in Indonesia and its surrounding region in the last decade affects on exploration of gas resources. However, the conventional gas reserves are decreased and more difficult to be found. The alternate gas sources, therefore should be substituted to fullfill the gas demand in the near future. Coalbed methane (CBM) is one of the unconventional gas which main composition is methane which is adsorbed in the matrix of coal and formed during the coalification process. CBM is produced by dewatering process, that is producing the water filled in the cleats inside coal layer to decrease reservoir pressure until desorption pressure is reached. Once desorption pressure is reached, methane released from coal matrix surface and flows through micropore to natural fractures towards the wellbore. This period of water producing is called dewatering time. Dewatering time prediction is very important for developing CBM project because this period of time will affect the value of the project and as the key to efficient gas production from these reservoir. To predict dewatering time, a reservoir engineer occasionally use reservoir simulation. Last research that already conducted by Halim, H (2013) gives an equation to estimate the dewatering time as function of reservoir area, reservoir thickness, fracture porosity, fracture permeability, desorption pressure, reservoir pressure, and bottomhole pressure. This study aims at estimation of dewatering time on Vertical CBM as function of reservoir and coal properties using Artificial Neural Network (ANN) technique. ANN technique is a poweful modelling tool to establish the complex relationship between input parameters and the dewatering time . A total number of data points consist of 335 sets has been used for generating, validating, and testing the ANN model. The best ANN model gives average data errors = 6% and will be compared with the latest equation that gives average data errors = 9%.
format Final Project
author Anggi Naluriawan Santoso, Ade
author_facet Anggi Naluriawan Santoso, Ade
author_sort Anggi Naluriawan Santoso, Ade
title PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
title_short PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
title_full PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
title_fullStr PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
title_full_unstemmed PENENTUAN WAKTU DEWATERING PADA SUMUR COALBED METHANE (CBM) JENIS VERTICAL WELL SEBAGAI FUNGSI SIFAT-SIFAT RESERVOIR DAN BATUBARA DENGAN MENGGUNAKAN ARTIFICIAL NEURAL NETWORK
title_sort penentuan waktu dewatering pada sumur coalbed methane (cbm) jenis vertical well sebagai fungsi sifat-sifat reservoir dan batubara dengan menggunakan artificial neural network
url https://digilib.itb.ac.id/gdl/view/64090
_version_ 1822932340278558720