#TITLE_ALTERNATIVE#
This observation cooperates with RPX Holding Company located in Cilandak road South Jakarta Background problem that explained in this observation is about overtime of courier work hours This happened because in the same route the driver should handle delivery customer goods and pick up delivery Howe...
Saved in:
Main Author: | Widi Muchlis 19004062, Mandala |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/6419 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: Widi Muchlis (NIM:190 04 062), Madala -
#TITLE_ALTERNATIVE#
by: YULIZAR (NIM 13502043); Pembimbing: Dr. Ir. Rila Mandala, M.Eng., STEVE -
#TITLE_ALTERNATIVE#
by: ROSMALINA MANDALA (NIM : 29108057); Pembimbing: Dr. Ir. Nurianna Thoha, MBA, LIZA -
#TITLE_ALTERNATIVE#
by: JAUHARUL FUADY (NIM: 23507039); Pembimbing: Dr. Ir. Rila Mandala, M.Eng., M. -
#TITLE_ALTERNATIVE#
by: NUGRAHA (NIM 23499032), WIDI