PEMODELAN TAHAP AWAL JARINGAN FASILITAS PERMUKAAN UNTUK SISTEM PRODUKSI DAN SISTEM INJEKSI GAS LIFT PADA LAPANGAN X MENGGUNAKAN PERANGKAT LUNAK INTEGRATED PRODUCTION MODELLING (IPM) : PROSPER & GAP
Nowadays, technology has grown rapidly and help to resolve the problem in various ways. In the oil industry itself, has a lot of software developed to help a variety of problems that are inside. To assist in the optimization of production strategies appropriate fore, identification of the problem an...
Saved in:
Main Author: | Perfibita, Randy |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64220 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMASI SKENARIO PENGEMBANGAN LAPANGAN KASUS RESERVOIR MULTILAPISAN X SECARA TERINTEGRASI BAWAH PERMUKAAN DAN FASILITAS PERMUKAAN DENGAN MENGGUNAKAN PERANTI LUNAK MATERIAL BALANCE
by: Wiryawan, Albert -
PENERAPAN METODE EQUAL SLOPE UNTUK MENGALOKASIKAN LAJU INJEKSI GAS LIFT UNTUK BEBERAPA SUMUR DI LAPANGAN A, LAPANGAN B, DAN LAPANGAN C
by: Manuel Widjaja, Tan -
OPTIMUM DESAIN INJEKSI GAS LIFT UNTUK MENINGKATKAN PERFORMA SUMUR X
by: Umaryono, Itto -
DESAIN STUDI APLIKASI HYBRID ESP-GAS LIFT DI LAPANGAN X
by: Azrialsyah, Fadlan -
ANALISIS APLIKASI SIPHON STRING UNTUK OPTIMASI INJEKSI GAS LIFT DAN MENGURANGI MASALAH ALIRAN SLUGGING
by: Muflih, Sofani