PERANCANGAN SISTEM PERPIPAAN PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (STUDI KASUS: PLTP UNIT IV LAHENDONG KLUSTER 24)
Saved in:
Main Author: | Pradipta, Irfan |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64227 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS TEGANGAN SISTEM PERPIPAAN FASILITAS PRODUKSI UAP PANAS BUMI AREA SCRUBBER UNIT IV LAHENDONG
by: Saptomo -
STUDI PERANCANGAN TEKNIS PEMBANGKIT LISTRIK TENAGA PANASBUMI (PLTP) PADA LAPANGAN PANASBUMI ENTALPI MENENGAH LAHENDONG SULAWESI UTARA
by: Hasan Pakaja<br> NIM: 232 89 011, Sandi -
ANALISIS UNJUK KERJA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) WAYANG WINDU PENGALENGAN JAWA BARAT TAHUN 2009
by: , Agus Supriyono, et al.
Published: (2011) -
PERANCANGAN SISTEM PENDINGINAN BRINE PADA PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP)
(STUDI KASUS : UNIT PRODUKSI PAD#29 PLTP PT. GEO DIPA ENERGI DIENG)
by: , PUNDY SAPUTRO, et al.
Published: (2013) -
PERHITUNGAN HIDRAULIK DAN PERANCANGAN POMPA DI PEMBANGKIT LISTRIK TENAGA PANAS BUMI (STUDI KASUS PERANCANGAN PERPIPAAN BRINE UNIT KARAHA PT. PERTAMINA GEOTHERMAL ENERGY)
by: , AKBAR SURYO SADARPO, et al.
Published: (2013)