STUDI OPTIMASI PERFORMA PRODUKSI DAN SURFACTANT FLOODING DENGAN SUMUR PRODUKSI HORIZONTAL DAN VARIASI POSISI-JUMLAH SUMUR INJEKSI PADA RESERVOIR MIRING
Reservoir structure which has a slope (dipping reservoir) will affect the performance of oil production. So it is necessary for production planning strategies, especially regarding the optimization of the position and location of injection wells that would affect the sweep efficiency. It also conduc...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/64229 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |