ANALISA MATERIAL BALANCE UNTUK SUMUR GAS MENGGUNAKAN DATA TEKANAN ALIR DASAR SUMUR
The P/z method has been widely used in determining in place in gas reservoir. This method requires reservoir pressures after shutting the well. After production, shutting the well is really avoided because the well can be off when it wants to be produced again. Because of that, the data are not ofte...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64322 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!