EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG
98% of the public's response is very positive to the existence of Trans Jateng Corridor I in the Semarang area and supports the development of BRT-based mass transportation (Priyanto (2018)). This supportive public response and interest in BRT development indicates that the implementation...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/64645 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:64645 |
---|---|
spelling |
id-itb.:646452022-05-31T08:52:18ZEFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG Hajar Aswad, Siti Indonesia Theses Data Envelopment Analysis, Best Practice Analysis for Change Management, BRT Trans Jateng, Collaboration Map INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/64645 98% of the public's response is very positive to the existence of Trans Jateng Corridor I in the Semarang area and supports the development of BRT-based mass transportation (Priyanto (2018)). This supportive public response and interest in BRT development indicates that the implementation of the BRT Trans Jateng, especially corridor I in the Semarang area, is considered quite successful. Therefore, it is necessary to analyze the factors that support the successful implementation of BRT Trans Jateng in terms of efficiency and it’s impact on the institutions. There are five methods used in this research, namely data envelopment analysis, association analysis, content analysis, collaboration map and best practice analysis for management change. Based on the data envelopment analysis, it was found that Covid-19 Pandemic influenced the implementation of the BRT Trans Jateng. Because there is an average decrease of 51.3% efficiency for the two routes that were tested. Meanwhile, in the process of association analysis, it is known that population is the most significant parameter that influences the number of passengers. The identification of institutional implementation of governance which applied in the BRT Trans Jateng in this study begins withwith a discussion of the implementation of the Trans Jateng BRT system, which is use the "Buy The Service" pattern and applied the scrapping mechanism, which has the concept of replacing the existing transport unit with a new one. In further discussion, based on the scoring table and collaboration maps, the most influential stakeholders in the implementation process of the BRT Trans Jateng are the Central Java Provincial Transportation Service and the Existing Bus Consortium Company. In the final stage, based on the maturity matrix score, the average value of the implementation score of the Trans Jateng BRT is 4.4. This indicates that the application of the Trans Jateng BRT by the Transportation Agency of the Central Java Province has a good application value which is above the average of the existing standards. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
98% of the public's response is very positive to the existence of Trans Jateng
Corridor I in the Semarang area and supports the development of BRT-based mass
transportation (Priyanto (2018)). This supportive public response and interest in
BRT development indicates that the implementation of the BRT Trans Jateng,
especially corridor I in the Semarang area, is considered quite successful.
Therefore, it is necessary to analyze the factors that support the successful
implementation of BRT Trans Jateng in terms of efficiency and it’s impact on the
institutions. There are five methods used in this research, namely data envelopment
analysis, association analysis, content analysis, collaboration map and best
practice analysis for management change. Based on the data envelopment analysis,
it was found that Covid-19 Pandemic influenced the implementation of the BRT
Trans Jateng. Because there is an average decrease of 51.3% efficiency for the two
routes that were tested. Meanwhile, in the process of association analysis, it is
known that population is the most significant parameter that influences the number
of passengers. The identification of institutional implementation of governance
which applied in the BRT Trans Jateng in this study begins withwith a discussion
of the implementation of the Trans Jateng BRT system, which is use the "Buy The
Service" pattern and applied the scrapping mechanism, which has the concept of
replacing the existing transport unit with a new one. In further discussion, based
on the scoring table and collaboration maps, the most influential stakeholders in
the implementation process of the BRT Trans Jateng are the Central Java
Provincial Transportation Service and the Existing Bus Consortium Company. In
the final stage, based on the maturity matrix score, the average value of the
implementation score of the Trans Jateng BRT is 4.4. This indicates that the
application of the Trans Jateng BRT by the Transportation Agency of the Central
Java Province has a good application value which is above the average of the
existing standards.
|
format |
Theses |
author |
Hajar Aswad, Siti |
spellingShingle |
Hajar Aswad, Siti EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
author_facet |
Hajar Aswad, Siti |
author_sort |
Hajar Aswad, Siti |
title |
EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
title_short |
EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
title_full |
EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
title_fullStr |
EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
title_full_unstemmed |
EFFICIENCY AND INSTITUTIONAL ANALYSIS IN BRT TRANS JATENG |
title_sort |
efficiency and institutional analysis in brt trans jateng |
url |
https://digilib.itb.ac.id/gdl/view/64645 |
_version_ |
1822277071826583552 |