PROPOSED IMPROVEMENTS TO FINISH THE DELAYED PROJECT OF PT ETS
PT ETS is a start-up that was previously engaged in the use and manufacture of drones which then shifted to engage in the Internet of Things (IoT) consulting. The latest project of PT ETS is a job given by PT XYZ to provide a system that can improve the traceability of the company's production...
Saved in:
Main Author: | Raditya Dwiprasta, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/64863 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF CMS-INTEGRATION PROJECT DELAYS AND PROPOSED PROJECT MANAGEMENT IMPROVEMENT AT LEN DEFENSE ELECTRONICS
by: Annajla, Faritsa -
PROPOSE STRATEGY FOR PROJECT MANAGEMENT IMPROVEMENT AT PT AKSAMAIA REKTA NUSA
by: Fahri Majid, Ferial -
PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
by: Farah Adzhani, Ethandra -
PROPOSED PROJECT IMPLEMENTATION PERFORMANCE MEASUREMENT IMPROVEMENT IN PT. LEN INDUSTRI (PERSERO)
by: Kurnia, Ridwan -
PROPOSED IMPROVEMENT FOR PROJECT MANAGEMENT IMPLEMENTATION OF PT TELKOM AKSES REGIONAL WEST JAVA
by: Rahmaniar Ahyudanari, Risa