#TITLE_ALTERNATIVE#

Abstract: <br /> <br /> <br /> <br /> <br /> The development of Waduk Sadawarna is to fulfill the amount of water required from assorted of need in Subang, Sumedang, and Indramayu District that having the amount of resident which progressively mount and also fast i...

Full description

Saved in:
Bibliographic Details
Main Author: Faisal (NIM 250 04 043), Muhammad
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6502
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:Abstract: <br /> <br /> <br /> <br /> <br /> The development of Waduk Sadawarna is to fulfill the amount of water required from assorted of need in Subang, Sumedang, and Indramayu District that having the amount of resident which progressively mount and also fast industry growth. Despitefully there are potency to increase area of non-technical and semi-technical irrigation become the technical irrigation which enough wide ( 30.000 ha), that spread over at Waduk Sadawarna downstream in Subang District and Indramayu District. <br /> <br /> <br /> <br /> <br /> As the fast of development in many sector, hence accomplishment of water pursuant to space, time, amount of, and quality will progressively mount. <br /> <br /> <br /> <br /> <br /> To anticipate various conflict of interest in exploiting water, hence felt important to plan the exploiting water of Cipunagara River in the form of accumulating basin, that is located in frontier of Subang District and Sumedang District that is Sadawarna Village, Cibogo Sub-District, Subang District and Tanjung Village, Buah Dua Sub-District, Sumedang District. Based on feasibility study result that in the location is feasible to be developed a dam. <br /> <br /> <br /> <br /> <br /> On the other side, there are reservoir potency called Waduk Cilame located close with the location of Waduk Sadawarna. Waduk Cilame exploit the water of Cilame River representing watercourse from Cipunagara River (order 3). The result of the feasibility study recommend that Waduk Cilame only feasible if connected with Waduk Sadawarna, with the assumption of Waduk Sadawarna give addition supply to Waduk Cilame. This Matter caused by a potency accomodate the Waduk Cilame which big enough is not supported with the availibility of adequate water (small catchment area). On the other hand, at certain time period (the rains), Waduk Sadawarna spill much water through the spillway. <br /> <br /> <br /> <br /> <br /> Based on the mentioned above, hence advanced hydrology study concerning interconnection of Waduk Sadawarna with Waduk Cilame require to be done. <br /> <br /> <br /> <br /> <br /> This Study shows significant contribution of interconnection between Waduk Sadawarna with Waduk Cilame and also recommends the operation of Waduk Sadawarna in giving supply to Waduk Cilame. <br />