A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES

ABSTRACT: <br /> <br /> <br /> <br /> <br /> broadly 606,6 KM2 and long 64,9 KM, representing one of potential water resources which can be developed its exploitation and applied in an optimal fashion to fulfill the requirement of drinking water, irrigation, settle...

Full description

Saved in:
Bibliographic Details
Main Author: Maita (NIM 95005312), Muksir
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6518
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:6518
spelling id-itb.:65182017-09-27T15:23:29ZA STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES Maita (NIM 95005312), Muksir Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/6518 ABSTRACT: <br /> <br /> <br /> <br /> <br /> broadly 606,6 KM2 and long 64,9 KM, representing one of potential water resources which can be developed its exploitation and applied in an optimal fashion to fulfill the requirement of drinking water, irrigation, settlement area, plantation, electricity and others. <br /> <br /> <br /> <br /> <br /> The yearly Rainfall in this area has ranges from 961 mm up to 4621 mm, and by using water availability analysis method like Water Balance, FJ. Mock and Nreca, these methods will simulate the monthly equilibrium water at one particular catchment area which will be posed at calculating total run-off by using monthly rainfall, evapotranspiration, humidity of soil, and ground water supply. <br /> <br /> <br /> <br /> <br /> The average water availability of this area per year is 20.5 M3/sec, whereas the water demand for projection until the year of 2025 is 10.91 M3/sec, indicating there is still having surplus of water, nevertheless still happening insufficiency of water about 2-3 month in a year, especially in fulfilling the irrigation requirement. <br /> <br /> <br /> <br /> <br /> In allocation of water for intermediate term and long term is required an effort of water resources development for accomplishment the requirement of intermediate term and long term, where need to be allowed for building an small reservoir or small dam with maximum capacities in around of 26,93 million M3. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT: <br /> <br /> <br /> <br /> <br /> broadly 606,6 KM2 and long 64,9 KM, representing one of potential water resources which can be developed its exploitation and applied in an optimal fashion to fulfill the requirement of drinking water, irrigation, settlement area, plantation, electricity and others. <br /> <br /> <br /> <br /> <br /> The yearly Rainfall in this area has ranges from 961 mm up to 4621 mm, and by using water availability analysis method like Water Balance, FJ. Mock and Nreca, these methods will simulate the monthly equilibrium water at one particular catchment area which will be posed at calculating total run-off by using monthly rainfall, evapotranspiration, humidity of soil, and ground water supply. <br /> <br /> <br /> <br /> <br /> The average water availability of this area per year is 20.5 M3/sec, whereas the water demand for projection until the year of 2025 is 10.91 M3/sec, indicating there is still having surplus of water, nevertheless still happening insufficiency of water about 2-3 month in a year, especially in fulfilling the irrigation requirement. <br /> <br /> <br /> <br /> <br /> In allocation of water for intermediate term and long term is required an effort of water resources development for accomplishment the requirement of intermediate term and long term, where need to be allowed for building an small reservoir or small dam with maximum capacities in around of 26,93 million M3.
format Theses
author Maita (NIM 95005312), Muksir
spellingShingle Maita (NIM 95005312), Muksir
A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
author_facet Maita (NIM 95005312), Muksir
author_sort Maita (NIM 95005312), Muksir
title A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
title_short A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
title_full A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
title_fullStr A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
title_full_unstemmed A STUDY OF WATER POTENCY AND WATER EXPLOITATION AT SINGKOYO WATERSHED IN BANGGAI REGENCY, CENTRAL CELEBES
title_sort study of water potency and water exploitation at singkoyo watershed in banggai regency, central celebes
url https://digilib.itb.ac.id/gdl/view/6518
_version_ 1820663912642641920