FAILURE ANALYSIS OF FLAT WAGON 54 TON (GD 54) STRUCTURES
In 2015, a total of 1213 units of 54-ton flat wagons were manufactured by PT. Industri Kereta Api has officially started operating in Indonesia. Around 10% of the total 1213 flat wagons cracked at the end of 2018. In this work, some analyses were conducted to investigate the causes of cracks in the...
Saved in:
Main Author: | Mushlih Elhafid, Muhammad |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/65478 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DYNAMICS ANALYSIS OF LONG COAL TRAIN 120 WAGONS DURING BRAKING
by: Nuansa Kharisma, Fariz -
DESIGNING A WHEEL-RAIL CONTACT FORCES MEASUREMENT METHOD FOR R54 RAIL
by: Razi, Akhmad -
Failure Analysis of Wingspar Structur
by: Anriana Hendarsyah, Yadi -
Failure Analysis of Nose Landing Gear Axle
by: DODY KURNIAWAN, MUHAMMAD -
PREDICTING SEVERITY LEVEL AND POSITION MAPPING OF WHEEL FLAT WITH TRACK ACCELERATION BASED MACHINE LEARNING MODEL
by: Althaafa Sukmaputra, Muhammad