IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT)
Through Presidential Decree No. 100 of 2014 j.o. Presidential Decree No. 117 of 2015, the Government gave a mandate to PT. Hutama Karya (Persero) to develop the Trans-Sumatra Toll Road (JTTS) which will connect Aceh Province to Lampung Province along 2,838km. This research focuses on the JTTS Stage...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/65674 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:65674 |
---|---|
spelling |
id-itb.:656742022-06-24T11:17:00ZIMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) Koentjoro Manajemen umum Indonesia Theses Infrastructure Projects, Risk Management, Risk Identification and Analysis, Risk Probability and Impact Levels. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/65674 Through Presidential Decree No. 100 of 2014 j.o. Presidential Decree No. 117 of 2015, the Government gave a mandate to PT. Hutama Karya (Persero) to develop the Trans-Sumatra Toll Road (JTTS) which will connect Aceh Province to Lampung Province along 2,838km. This research focuses on the JTTS Stage 2 of the Jambi-Rengat segment. This toll road infrastructure project is categorized as having high risk due to the very large investment value with low financial feasibility, large area with various characteristics, and diverse stakeholders; therefore, risk management is crucial in this project. Referring to ISO 31000:2018, PMBOK 6th Edition, and PT HK's Enterprise Risk Management Manual, risk management in this study includes the process of risk identification, risk analysis, and mitigation planning. Risk identification is carried out using brainstorming and interviews methods with respondents who have abundant experience. Risk analysis by determining the level of risk exposure is carried out using a survey method to respondents from a different group. The level of risk exposure is calculated to establish the order of priority for follow-up on Risk Treatment. Furthermore, the risk mitigation plan is determined based on the level of exposure for each risk. From the results of risk mapping based on exposure level, it is concluded that there are 5 identified risks which are classified as Extreme Risk, 17 High Risk, and 3 Moderate Risk. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Koentjoro IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
description |
Through Presidential Decree No. 100 of 2014 j.o. Presidential Decree No. 117 of 2015, the Government gave a mandate to PT. Hutama Karya (Persero) to develop the Trans-Sumatra Toll Road (JTTS) which will connect Aceh Province to Lampung Province along 2,838km. This research focuses on the JTTS Stage 2 of the Jambi-Rengat segment. This toll road infrastructure project is categorized as having high risk due to the very large investment value with low financial feasibility, large area with various characteristics, and diverse stakeholders; therefore, risk management is crucial in this project. Referring to ISO 31000:2018, PMBOK 6th Edition, and PT HK's Enterprise Risk Management Manual, risk management in this study includes the process of risk identification, risk analysis, and mitigation planning. Risk identification is carried out using brainstorming and interviews methods with respondents who have abundant experience. Risk analysis by determining the level of risk exposure is carried out using a survey method to respondents from a different group. The level of risk exposure is calculated to establish the order of priority for follow-up on Risk Treatment. Furthermore, the risk mitigation plan is determined based on the level of exposure for each risk. From the results of risk mapping based on exposure level, it is concluded that there are 5 identified risks which are classified as Extreme Risk, 17 High Risk, and 3 Moderate Risk.
|
format |
Theses |
author |
Koentjoro |
author_facet |
Koentjoro |
author_sort |
Koentjoro |
title |
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
title_short |
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
title_full |
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
title_fullStr |
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
title_full_unstemmed |
IMPLEMENTATION OF RISK MANAGEMENT IN TOLL ROAD PROJECT (CASE STUDY IN TRANS SUMATERA TOLL ROAD JAMBI - RENGAT SEGMENT) |
title_sort |
implementation of risk management in toll road project (case study in trans sumatera toll road jambi - rengat segment) |
url |
https://digilib.itb.ac.id/gdl/view/65674 |
_version_ |
1822932816807067648 |