GEOTHERMAL SYSTEM MODELLING BASED ON GRAVITY DATA OF KEPAHIANG GEOTHERMAL FIELD, BENGKULU, INDONESIA

Indonesia government has made a target to increase the generating capacity of Renewable New Energy (EBT) to 11,791 MW and made a roadmap to develop geothermal power with the aim to increase geothermal capacity from 2.13 GW in 2019, to 7.87 GW by 2030, and to 9.3 GW by 2035. To reach this target,...

Full description

Saved in:
Bibliographic Details
Main Author: Firdian Saputra, Anggi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/65797
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia