DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X

The competitiveness of a manufacturing industry company is determined by an effective production method with minimum waste (lean production). Overall Equipment Effectiveness (OEE) and the six big losses are methods that can be used to assess the effectiveness of using a machine. Many companies...

Full description

Saved in:
Bibliographic Details
Main Author: Anisa Maisyara, Yuyu
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66236
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66236
spelling id-itb.:662362022-06-27T14:51:05ZDEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X Anisa Maisyara, Yuyu Indonesia Theses system, OEE, six big losses, user requirements, prototyping, efficient, accurate INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66236 The competitiveness of a manufacturing industry company is determined by an effective production method with minimum waste (lean production). Overall Equipment Effectiveness (OEE) and the six big losses are methods that can be used to assess the effectiveness of using a machine. Many companies perform manual OEE monitoring with the disadvantage of being inefficient and less accurate. It is PT X that monitors OEE and six big losses manually using a worksheet for liquid dosage filling machines. This study aims to develop an OEE data processing and reporting system for liquid dosage filling machines that can improve the OEE monitoring process at PT X. The system development is carried out using a prototyping method based on the results of business analysis and user needs. Analysis of business and user needs is carried out based on the results of collecting literature data, interviews, and direct observations on the liquid filling line at PT X. System development begins with rapid system design based on user needs, then prototype and system coding by programmers. The system is tested by verifying the data entry into the form in system. The validity of the system calculation results is carried out by comparing the results of manual calculations to the results of system calculations using OEE data for January 2022. OEE monitoring using the developed system has the potential to increase the efficiency of PT X's monthly OEE monitoring process by facilitating the process of data entry, data processing and reports that are automatically generated. The system provides valid results for the calculation of OEE and six big losses with a calculation difference of 0. This system is different from several OEE calculation systems developed in other studies because it can calculate six big losses and is specific for liquid dosage filling machines at PT X. From This research, it is concluded that the developed system can increase the efficiency of the monthly OEE monitoring process of the liquid dosage filling machine at PT X up to 48.8%. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The competitiveness of a manufacturing industry company is determined by an effective production method with minimum waste (lean production). Overall Equipment Effectiveness (OEE) and the six big losses are methods that can be used to assess the effectiveness of using a machine. Many companies perform manual OEE monitoring with the disadvantage of being inefficient and less accurate. It is PT X that monitors OEE and six big losses manually using a worksheet for liquid dosage filling machines. This study aims to develop an OEE data processing and reporting system for liquid dosage filling machines that can improve the OEE monitoring process at PT X. The system development is carried out using a prototyping method based on the results of business analysis and user needs. Analysis of business and user needs is carried out based on the results of collecting literature data, interviews, and direct observations on the liquid filling line at PT X. System development begins with rapid system design based on user needs, then prototype and system coding by programmers. The system is tested by verifying the data entry into the form in system. The validity of the system calculation results is carried out by comparing the results of manual calculations to the results of system calculations using OEE data for January 2022. OEE monitoring using the developed system has the potential to increase the efficiency of PT X's monthly OEE monitoring process by facilitating the process of data entry, data processing and reports that are automatically generated. The system provides valid results for the calculation of OEE and six big losses with a calculation difference of 0. This system is different from several OEE calculation systems developed in other studies because it can calculate six big losses and is specific for liquid dosage filling machines at PT X. From This research, it is concluded that the developed system can increase the efficiency of the monthly OEE monitoring process of the liquid dosage filling machine at PT X up to 48.8%.
format Theses
author Anisa Maisyara, Yuyu
spellingShingle Anisa Maisyara, Yuyu
DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
author_facet Anisa Maisyara, Yuyu
author_sort Anisa Maisyara, Yuyu
title DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
title_short DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
title_full DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
title_fullStr DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
title_full_unstemmed DEVELOPMENT OF OEE (OVERALL EQUIPMENT EFFECTIVENESS) DATA PROCESSING AND REPORTING SYSTEM AS IMPROVEMENT OF OEE VALUE MONITORING PROCESS OF LIQUID FILLING MACHINE AT PT X
title_sort development of oee (overall equipment effectiveness) data processing and reporting system as improvement of oee value monitoring process of liquid filling machine at pt x
url https://digilib.itb.ac.id/gdl/view/66236
_version_ 1822005095117619200