STRUCTURE DESIGN OF DOLPHIN TYPE ROLL ON/ROLL OFF AT LIKUPANG MUNTE PORT, NORTH SULAWESI

support the Special Economic Zone. One of the terminals being developed is a roll on/roll off terminal. In this final project, the roll on/roll off pier is made into a floating structure due to the condition of the waters around the port which has the highest tidal difference and the highest low...

Full description

Saved in:
Bibliographic Details
Main Author: Syauqy Gharib, Ahmad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/66246
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:support the Special Economic Zone. One of the terminals being developed is a roll on/roll off terminal. In this final project, the roll on/roll off pier is made into a floating structure due to the condition of the waters around the port which has the highest tidal difference and the highest low tide of 2,293 meters. The wharf design phase starts from collecting environmental data, calculating the load due to environmental and operational loads, calculating the bearing capacity of the soil, pre-design stage, and structural modeling. The results of the modeling are unity check ratio (UCR) and deflection. The result of this final project is the design of the pier in the form of structural dimensions and pier elements consisting of 5 breasting dolphin structures with a size of 6 m ???? 6 m with 700 mm diameter 22 mm thick piles with a pile depth of 20 meters, 2 mooring dolphin structures with a size of 2 m ???? 2 m with 400 mm diameter 15 mm thick piles with a pile depth of 14 meters, 1 pontoon structure with a size of 16 m ???? 14 m ???? 4 m with 600 mm diameter thick 22 mm piles, 1 ramp bridge with a size of 18 m ???? 8 m and 1 trestle with a total span of 70 meters with 500 mm diameter 15 m thick piles with a pile depth of 16 meters.