PERENCANAAN MANAJEMEN KONSTRUKSI FASILITAS PENGELOLAAN SAMPAH TERPADU BAGI KAWASAN BANDUNG RAYA DI TPA SARIMUKTI
Saved in:
Main Author: | Muhammad Hanif, Kemal |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66373 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STRUCTURAL DESIGN OF INTEGRATED WASTE MANAGEMENT FACILITY FOR BANDUNG RAYA AREA AT TPA SARIMUKTI
by: Pawennari, Irfan -
DESIGN OF RAFT PILE FOUNDATIONS AND SHEET PILE OF INTEGRATED WASTE MANAGEMENT FACILITY FOR BANDUNG RAYA AREA AT TPA SARIMUKTI
by: Mahardika Rafif, Nadia -
ANALYSIS OF CH4 AND CO2 GAS EMISSION FROM TPA SARIMUKTI
by: WIDYA HAPSARI (NIM 15304095); Pembimbing: Prof. Dr. Ir. Enri Damanhuri, SARASWATI -
DESIGN OF REFUSE DERIVED FUEL (RDF) PLANT IN WASTE UTILIZATION AT TPA SARIMUKTI
by: Dwi Surya, Anggia -
INTERPRETATION OF CONTAMINATED FLUID FLOW USING SELF-POTENTIAL METHODS AT TPA SARIMUKTI, BANDUNG BARAT
by: Dwi Putri Julianti, Fikra