EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19

In Indonesia, the number of confirmed cases of COVID-19 until Januari 5th, 2022 was 4.264.136 cases with the highest number of death cases found with a total of 144.109 cases. [1] Seeing the increasing number of COVID-19 transmissions, more attention should be directed towards efforts to find met...

Full description

Saved in:
Bibliographic Details
Main Author: Satria Zulfikar, Elang
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66408
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66408
spelling id-itb.:664082022-06-28T09:46:44ZEVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19 Satria Zulfikar, Elang Indonesia Final Project COVID-19, HVAC, cooling load INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66408 In Indonesia, the number of confirmed cases of COVID-19 until Januari 5th, 2022 was 4.264.136 cases with the highest number of death cases found with a total of 144.109 cases. [1] Seeing the increasing number of COVID-19 transmissions, more attention should be directed towards efforts to find methods to inhibit the spread of the COVID-19 outbreak, one of which is by facilitating all health agencies in Indonesia, with an adequate HVAC (Heating, Ventilating, and Air Conditioning) system. The role of HVAC systems in health facilities includes supplying fresh air; air filtering; maintaining room pressure, so that air flows from a cleaner place to a dirtier place, and condition the room to have the desired temperature and humidity. The process of designing the air conditioning systems of Puskesmas South Tangerang involves two major phases, which is the evaluation phase, and the redesigning phase. The evaluation phase will be done by identifying and comparing field conditions towards the minimum requirements set by state regulation and recommendations put forth by international standards in the field of air conditioning. The second phase, which is the redesigning phase, will be done by doing a building survey, followed by doing a cooling load simulation and calculation, then determining the specification of each air conditioning component which is suited with the simulation and calculation results along with the regulation in effect, ended with making a two and three dimensional drawing. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description In Indonesia, the number of confirmed cases of COVID-19 until Januari 5th, 2022 was 4.264.136 cases with the highest number of death cases found with a total of 144.109 cases. [1] Seeing the increasing number of COVID-19 transmissions, more attention should be directed towards efforts to find methods to inhibit the spread of the COVID-19 outbreak, one of which is by facilitating all health agencies in Indonesia, with an adequate HVAC (Heating, Ventilating, and Air Conditioning) system. The role of HVAC systems in health facilities includes supplying fresh air; air filtering; maintaining room pressure, so that air flows from a cleaner place to a dirtier place, and condition the room to have the desired temperature and humidity. The process of designing the air conditioning systems of Puskesmas South Tangerang involves two major phases, which is the evaluation phase, and the redesigning phase. The evaluation phase will be done by identifying and comparing field conditions towards the minimum requirements set by state regulation and recommendations put forth by international standards in the field of air conditioning. The second phase, which is the redesigning phase, will be done by doing a building survey, followed by doing a cooling load simulation and calculation, then determining the specification of each air conditioning component which is suited with the simulation and calculation results along with the regulation in effect, ended with making a two and three dimensional drawing.
format Final Project
author Satria Zulfikar, Elang
spellingShingle Satria Zulfikar, Elang
EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
author_facet Satria Zulfikar, Elang
author_sort Satria Zulfikar, Elang
title EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
title_short EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
title_full EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
title_fullStr EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
title_full_unstemmed EVALUATION AND DESIGN OF AIR CONDITIONING SYSTEMS OF A COVID-19 TRANSITORY HEALTHCARE FACILITY OF SOUTH TANGERANG IN MITIGATING COVID-19
title_sort evaluation and design of air conditioning systems of a covid-19 transitory healthcare facility of south tangerang in mitigating covid-19
url https://digilib.itb.ac.id/gdl/view/66408
_version_ 1822277616369926144