#TITLE_ALTERNATIVE#

ABSTRACT: <br /> <br /> <br /> <br /> <br /> Clean water is required as elementary needs for human being which must fulfilled, especially in urban area. Source of clean water of Bandung, including area of South <br /> <br /> <br /> <br /&g...

Full description

Saved in:
Bibliographic Details
Main Author: Putri (NIM 15302054), Ratih
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6646
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:ABSTRACT: <br /> <br /> <br /> <br /> <br /> Clean water is required as elementary needs for human being which must fulfilled, especially in urban area. Source of clean water of Bandung, including area of South <br /> <br /> <br /> <br /> <br /> Bandung come from Badaksinga WTP. In order to improve the quality of service, hence area of South Bandung will serve peculiarly by a new water source from Cimenteng WTP, in Sub-Province of Banjaran, located about 70 km in southwest of Bandung. Period of planning is for 20 years. Amount of clean water that required can be calculated by projection growth of resident and development planning of South Bandung. This is relating to Regional Plan of Planology ( RTRW) of Bandung in year 2013. Clean water transported directly through a distribution pipe. Distribution network was made by EPANET software with trial and error method in which put pipe diameter so that the network fulfill technical criteria of design. The most important criteria which must fulfilled are velocity in pipe, ranging from 0,6m/second-3m/second, and head for tapping at least 10 m. Besides that, this planning also analyze the economic eligibility to find comparison from various condition of distribution network. Based on analysis, the biggest Benefit per Cost Ratio (BCR) owned by alternative 2. So that the selected distribution network is alternative 2 with total length of pipeline is 91,644km.