PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X

PT X is a company that engaged in the e-grocery sector. PT X has served more than 500,000 users and generated more than 4 million orders. However, a tight competition with strong competitors has required PT X to have a strategic project. One of the strategic project from PT X is affiliate program...

Full description

Saved in:
Bibliographic Details
Main Author: Dwi Putra, Aldi
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66493
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:66493
spelling id-itb.:664932022-06-28T13:04:11ZPERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X Dwi Putra, Aldi Indonesia Final Project RPA, automation, bot, manual processes, waterfall method INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/66493 PT X is a company that engaged in the e-grocery sector. PT X has served more than 500,000 users and generated more than 4 million orders. However, a tight competition with strong competitors has required PT X to have a strategic project. One of the strategic project from PT X is affiliate program. Affiliate program is a program where PT X cooperate with housewives and ask them to become sales representative. Since launched, this program has acquired more than 2,500 agents and this number is growing every week. This program initially launched as part of Growth Division but due to its rapid growth PT X decided to make a specialized division to execute the program called Division A. The main task of Division A is to plan and execute the whole affiliate program. Since it’s only been established for 4 months, Division A still has a lot of manual processes one of them is personal voucher. Thus, Division A need a solution to reduce the amount of manual processes and increase the efficiency of personal voucher. The solution that can be implemented by Division A is bot. Waterfall method are used in the bot development process with 3 main performance indicators: reduce manual processes, reduce error rate, reduce process time. Based on the trial it is found that the average process time for each voucher is 8.4 seconds with 100% accuracy rate. Therefore, the implementation of bot can be done by Division A to reduce the manual process in personal vouchers. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT X is a company that engaged in the e-grocery sector. PT X has served more than 500,000 users and generated more than 4 million orders. However, a tight competition with strong competitors has required PT X to have a strategic project. One of the strategic project from PT X is affiliate program. Affiliate program is a program where PT X cooperate with housewives and ask them to become sales representative. Since launched, this program has acquired more than 2,500 agents and this number is growing every week. This program initially launched as part of Growth Division but due to its rapid growth PT X decided to make a specialized division to execute the program called Division A. The main task of Division A is to plan and execute the whole affiliate program. Since it’s only been established for 4 months, Division A still has a lot of manual processes one of them is personal voucher. Thus, Division A need a solution to reduce the amount of manual processes and increase the efficiency of personal voucher. The solution that can be implemented by Division A is bot. Waterfall method are used in the bot development process with 3 main performance indicators: reduce manual processes, reduce error rate, reduce process time. Based on the trial it is found that the average process time for each voucher is 8.4 seconds with 100% accuracy rate. Therefore, the implementation of bot can be done by Division A to reduce the manual process in personal vouchers.
format Final Project
author Dwi Putra, Aldi
spellingShingle Dwi Putra, Aldi
PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
author_facet Dwi Putra, Aldi
author_sort Dwi Putra, Aldi
title PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
title_short PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
title_full PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
title_fullStr PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
title_full_unstemmed PERANCANGAN AUTOMASI PROSES UNTUK MENINGKATKAN EFISIENSI PROSES ONBOARDING MITRA PADA DIVISI AFFILIATE PT X
title_sort perancangan automasi proses untuk meningkatkan efisiensi proses onboarding mitra pada divisi affiliate pt x
url https://digilib.itb.ac.id/gdl/view/66493
_version_ 1822277638265241600