FEASIBILITY STUDY OF MOORING WINCH SYSTEM ON NUSA KAMBANGAN JETTY AND KARANGTALUN JETTY FOR PT. SOLUSI BANGUN INDONESIA
The Nusa Kambangan jetty and Karangtalun jetty for PT. Solusi Bangun Indonesia (SBI) utilizes one tugboat by pushing the barge to move the position of the barge during loading or unloading process. This is not effective as there is only one tugboat to support the loading and unloading process of...
Saved in:
Main Author: | Mangaraja Sinay, Daniel |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/66748 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DEVELOPMENT OF OPERATIONAL VISUALIZATION ON SUSTAINABLE AGRO ENERGY SYSTEM CASE STUDY: PLTM KAMBANGAN
by: Muhammad Irfan, Azka -
PEMANFAATAN STIMULASI KREATIVITAS DALAM PENCARIAN SOLUSI MASALAH RANCANG BANGUN STUDI KASUS : PERALATAN MESIN PERTANIAN
by: Agus Nugroho, Eko -
FRANCIS TURBINE 2 MW DESIGN WITH CASE STUDY KAMBANGAN MINI HYDRO POWER WITH HEAD 87 M AND DISCHARGE 2.8 M3/S
by: Danu Aditya Rachman, Rovky -
SOLUSI ANALITIK PENYEBARAN SEDIMEN PADA PERAIRAN TIDAK BERARUS DAN SALURAN ANULAR
by: Irfan Sitanggang (NIM 25097069), Khairil -
PRELIMINARY DESIGN OF A MOORING SYSTEM FOR 1 MWP FLOATING PHOTOVOLTAIC IN JATIGEDE RESERVOIR, WEST JAVA
by: Kristian P S, Pandu